Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47949
Well Classification: OW Status: PR - 2/22/2021
Well Name/No:Dream Weaver South #3K-21H-N268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/22/2021
FacilityID:457514LocationID:457515
Municipality/County:FREDERICK / WELD #123Location:SESW 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4901 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:942FSL  1916 FWLLat/Long: 40.119473 / -105.010872Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.119470 / -105.010870Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/22/2020
End Date: 12/22/2020
Reported: 5/18/2021
Originally Reported: 1/21/2021
Days to report: 147
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/22/2021             Measured TD: 19068 ft.    Vertical TD: 7404 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/22/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/20/2020
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1349 FNL  2673 FWL
Bottom Hole Location:Sec:33 Twp: 2N 68W Footage: 478 FSL  2585 FWL
Proposed Depth/Form:19075 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2172 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 841, Top: 0 ft., Bottom: 2172 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19075 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2735, Top: , Bottom: 19075 ft.

Wellbore Completed
Completion Date:2/12/2020
Spud Date:9/5/2019Spud Date Is:ACTUAL
Measured TD:19068 ft.Measured PB depth:19035 ft.
True Vertical TD:7404 ft.True Vertical PB depth:7404 ft.
Top PZ Location:Sec:21 Twp: 2N 68WFootage: 1349 FNL  2673 FWL
Bottom Hole Location:Sec:33 Twp: 2N 68WFootage: 478 FSL  2585 FWL
Log Types:MWD/LWD (IND in 123-20125)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2240 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 982, Top: 0 ft., Bottom: 2240 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19050 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2399, Top: 2352 ft., Bottom: 19050 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4287 ft.NN
SHANNON4902 ft.NN
SHARON SPRINGS7328 ft.NN
NIOBRARA7501 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/22/2021                 Interval Top: 7511 ft.    Interval Bottom: 19023 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/17/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/22/2020Treatment End Date:12/22/2020
Treatment Summary:427400 bbls of water, 184 bbls of additives (FRP-22G, Bardac 2250M, Bellacide 355, Dixichlor Max, SAFE-BFH-2, XLS-3Z, BHL-68W, ACI-97, ASF-67) and 96 bbl HCL in a 61 stage frac with 29026 lbs of DFR-1X, 4281 lbs of DFR-2S, 785 lbs of PGA-4045, 2200 lbs of Calcium Chloride, 7613385 lbs of silica quartz proppant Oil and water are metered from flowback equipment. The daily water volumes are periodically checked against trucked volumes. All meters are calibrated before use on every pad.
Total fluid used in treatment (bbls):448336Max pressure during treatment (psi):9161
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:61
Total acid used in treatment (bbls):96Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):20656Total flowback volume recovered (bbls):15342
Fresh water used in treatment (bbls):427584Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7613385Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7347 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/22/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 545
BBLS_OIL 678
BTU_GAS 1270
CALC_BBLS_H2O 545
CALC_BBLS_OIL 678
CALC_GOR 1499
CALC_MCF_GAS 1016
CASING_PRESS 2400
GRAVITY_OIL 50
MCF_GAS 1016
TUBING_PRESS 1825
Perforation Data:
Interval Top:7511 ft.# Of Holes:1418
Interval Bottom:19023 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)14619
Total Gas Produced (MCF)331305
GOR22662
GOR DeterminationMCFE
Average BOE per Day196.506
Average MCFE per Day1139.746

 Federal Financial Assurance  i 

 Tribal Well  i No