|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2024 Measured TD: 14019 ft. Vertical TD: 6452 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/5/2020 | Prop Depth/Form: | 14405 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1051 , Unit Acreage: 960, Drill Unit: 8: ALL, 17: N/2 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 0 ft., Bottom: 1850 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14405 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1860, Top: 4000 ft., Bottom: 14405 ft. |
| | |
Wellbore Completed | Completion Date: | 11/10/2018 | Spud Date: | 10/9/2018 | Spud Date Is: | ACTUAL | Measured TD: | 14019 ft. | Measured PB depth: | 13967 ft. | True Vertical TD: | 6452 ft. | True Vertical PB depth: | 6454 ft. | Top PZ Location: | Sec:17 Twp: 8N 60W | Footage: 2237 FNL 1495 FWL | Depth | Bottom Hole Location: | Sec:8 Twp: 8N 60W | Footage: 226 FNL 1596 FWL | Depth | Log Types: | MWD/LWD, MUD, CBL, (Resistivity in API 123-47779) | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1883 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 1883 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14013 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2010, Top: 210 ft., Bottom: 14019 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3446 ft. | | | | SUSSEX | 4287 ft. | | | | SHARON SPRINGS | 6248 ft. | | | | NIOBRARA | 6364 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2024 Interval Top: 6705 ft. Interval Bottom: 13923 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/21/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 12/1/2018 | Treatment End Date: | 12/13/2018 | Treatment Summary: | 48 stage perf & pluf completion- 13923'-6705': 258990 total bbls fluid: 258419 bbls fresh water (slurry) & 571 bbls HCl
17382403 lbs total proppant (40/70 sand) | Total fluid used in treatment (bbls): | 258990 | Max pressure during treatment (psi): | 8391 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.40 | Type Of gas: | | Number Of staged intervals: | 48 | Total acid used in treatment (bbls): | 571 | Min frac gradient (psi/ft): | 0.08 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 19064 | Fresh water used in treatment (bbls): | 258419 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 17382403 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6602 ft. | Tubing Packer Depth: | 6596 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/22/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 423 | BBLS_OIL | 548 | BTU_GAS | 1451 | CALC_BBLS_H2O | 423 | CALC_BBLS_OIL | 548 | CALC_GOR | 672 | CALC_MCF_GAS | 368 | GRAVITY_OIL | 36 | MCF_GAS | 368 | TUBING_PRESS | 184 |
| Perforation Data: | Interval Top: | 6705 ft. | # Of Holes: | 1130 | Interval Bottom: | 13923 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|