Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47733
Well Classification: OW Status: PR - 9/1/2025
Well Name/No:Herren #1C-33H-H367
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2025
FacilityID:457039LocationID:331342
County:WELD #123Location:SENE 33 3N67W 6
Field:WATTENBERG - #90750Elevation:4847 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2264FNL  376 FELLat/Long: 40.183263 / -104.887091Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.183263 / -104.887091Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/29/2019
End Date: 2/3/2019
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 124
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2025             Measured TD: 12301 ft.    Vertical TD: 7333 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/30/2020
Proposed Top PZ Location:Sec:33 Twp: 3N 67W Footage: 315 FNL  460 FEL
Bottom Hole Location:Sec:33 Twp: 3N 67W Footage: 307 FNL  465 FWL
Proposed Depth/Form:12281 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 120 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 95, Top: 0 ft., Bottom: 120 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2008 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 782, Top: 0 ft., Bottom: 2008 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12281 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1666, Top: 0 ft., Bottom: 12281 ft.

Wellbore Completed
Completion Date:12/12/2018
Spud Date:11/22/2018Spud Date Is:ACTUAL
Measured TD:12301 ft.Measured PB depth:12272 ft.
True Vertical TD:7333 ft.True Vertical PB depth:7333 ft.
Top PZ Location:Sec:33 Twp: 3N 67WFootage: 315 FNL  460 FEL
Bottom Hole Location:Sec:33 Twp: 3N 67WFootage: 307 FNL  465 FWL
Log Types:MUD, MWD/LWD, CBL (DIL in 123-20523)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 98, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2008 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 789, Top: 0 ft., Bottom: 2023 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12283 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1633, Top: 744 ft., Bottom: 12301 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4408 ft.NN
SHANNON4946 ft.NN
TEEPEE BUTTES6445 ft.NN
SHARON SPRINGS7297 ft.NN
NIOBRARA7378 ft.NN
FORT HAYS7803 ft.NN
CODELL7873 ft.NN
CARLILE10176 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/16/2021                 Interval Top: 10176 ft.    Interval Bottom: 10235 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/16/2021Treatment End Date:N/A
Treatment Summary:Carlile: 10176-10235
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10176 ft.# Of Holes:337
Interval Bottom:10235 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/16/2021                 Interval Top: 10014 ft.    Interval Bottom: 10175 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/16/2021Treatment End Date:N/A
Treatment Summary:Ft Hays: 10014-10175
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10014 ft.# Of Holes:337
Interval Bottom:10175 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/1/2025                  Interval Top: 8030 ft.    Interval Bottom: 12256 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/26/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/29/2019Treatment End Date:2/3/2019
Treatment Summary:985664 bbls of water, 95 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 6 bbl HCL in a 15 stage frac with 2511130 lbs of silica quartz proppant
Total fluid used in treatment (bbls):985765Max pressure during treatment (psi):8661
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7434
Fresh water used in treatment (bbls):985759Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2511130Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7672 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/20/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 327
BBLS_OIL 324
BTU_GAS 1284
CALC_BBLS_H2O 327
CALC_BBLS_OIL 324
CALC_GOR 3383
CALC_MCF_GAS 1096
CASING_PRESS 2100
GRAVITY_OIL 43
MCF_GAS 1096
TUBING_PRESS 1125
Perforation Data:
Interval Top:8030 ft.# Of Holes:337
Interval Bottom:12256 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/16/2021                 Interval Top: 8030 ft.    Interval Bottom: 12256 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/16/2021Treatment End Date:N/A
Treatment Summary:Codell: 8030-10013, 10236-12256
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8030 ft.# Of Holes:337
Interval Bottom:12256 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)18
Total Gas Produced (MCF)620
GOR34444
GOR DeterminationMCFE
Average BOE per Day0.344
Average MCFE per Day2.005

 Federal Financial Assurance  i 

 Tribal Well  i No