Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47702
Well Classification: OW Status: PR - 6/1/2023
Well Name/No:Bost Farm #41C-8-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2023
FacilityID:456996LocationID:456832
Municipality/County:GREELEY / WELD #123Location:SWNW 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1397FNL  941 FWLLat/Long: 40.417701 / -104.829011Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417701 / -104.829011Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/22/2019
End Date: 4/29/2019
Reported: 6/18/2019
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2023             Measured TD: 17718 ft.    Vertical TD: 7389 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 1233 FNL  752 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 1180 FNL  322 FEL
Proposed Depth/Form:17641 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17641 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2171, Top: , Bottom: 17641 ft.

Wellbore Completed
Completion Date:12/2/2018
Spud Date:10/9/2018Spud Date Is:ACTUAL
Measured TD:17718 ft.Measured PB depth:17603 ft.
True Vertical TD:7389 ft.True Vertical PB depth:7388 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 1233 FNL  752 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 1180 FNL  322 FEL
Log Types:MWD/LWD, CBL, MUD, (RES/GR in API: 05-123-47691)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1811 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 699, Top: 0 ft., Bottom: 1811 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17685 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2333, Top: 74 ft., Bottom: 17593 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4239 ft.NN
SHANNON4814 ft.NN
PARKMAN6391 ft.NN
SHARON SPRINGS6953 ft.NN
NIOBRARA6992 ft.NN
FORT HAYS7436 ft.NN
CODELL7497 ft.NN
CARLILE7600 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/21/2020                 Interval Top: 9133 ft.    Interval Bottom: 9181 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2020Treatment End Date:N/A
Treatment Summary:Perforated intervals: 9133'-9181'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9133 ft.# Of Holes:1584
Interval Bottom:9181 ft.Hole Size:0.46 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 6/1/2023                  Interval Top: 8273 ft.    Interval Bottom: 17533 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/11/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/8/2019Treatment End Date:6/13/2019
Treatment Summary:Plug and perf completion type, 44 stages. 210554 bbl of slickwater and gel. 48 bbl of 15% HCL acid used. 8691007 lbs proppant: 271000 lbs of 100 mesh, 220000 lbs 20/40, 8200007 lbs 40/70 proppant.
Total fluid used in treatment (bbls):210602Max pressure during treatment (psi):7176
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:44
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3045
Fresh water used in treatment (bbls):210554Disposition method For flowback:DISPOSAL
Total proppant used (lbs):8691007Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7323 ft.
Tubing Packer Depth:7301 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/29/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 358
BBLS_OIL 408
BTU_GAS 1000
CALC_BBLS_H2O 358
CALC_BBLS_OIL 408
CALC_GOR 3071
CALC_MCF_GAS 1253
CASING_PRESS 35
GRAVITY_OIL 49
MCF_GAS 1253
TUBING_PRESS 1594
Perforation Data:
Interval Top:8273 ft.# Of Holes:1584
Interval Bottom:17533 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/21/2020                 Interval Top: 8273 ft.    Interval Bottom: 17533 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2020Treatment End Date:N/A
Treatment Summary:Perforated intervals: 8273'-8375', 8983'-9083', 9233'-17533'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8273 ft.# Of Holes:1584
Interval Bottom:17533 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2980
Total Gas Produced (MCF)32017
GOR10743
GOR DeterminationBOE
Average BOE per Day23.171
Average MCFE per Day134.396

 Federal Financial Assurance  i 

 Tribal Well  i No