Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47698
Well Classification: OW Status: PR - 7/31/2019
Well Name/No:Bost Farm #8N-8C-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/31/2019
FacilityID:456992LocationID:456832
Municipality/County:GREELEY / WELD #123Location:SWNW 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1457FNL  940 FWLLat/Long: 40.417537 / -104.829013Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417537 / -104.829013Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2019
End Date: 4/12/2019
Reported: 6/12/2019
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/31/2019             Measured TD: 17645 ft.    Vertical TD: 7290 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/31/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 1912 FNL  150 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 1874 FNL  460 FEL
Proposed Depth/Form:17547 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17547 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2157, Top: , Bottom: 17547 ft.

Wellbore Completed
Completion Date:12/13/2018
Spud Date:10/6/2018Spud Date Is:ACTUAL
Measured TD:17645 ft.Measured PB depth:17519 ft.
True Vertical TD:7290 ft.True Vertical PB depth:7289 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 1895 FNL  175 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 1845 FNL  396 FEL
Log Types:MWD/LWD, CBL, MUD, (RES/GR in API: 05-123-47691)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1819 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 730, Top: 0 ft., Bottom: 1819 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17645 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2339, Top: 20 ft., Bottom: 17519 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3710 ft.NN
SUSSEX4257 ft.NN
SHANNON4838 ft.NN
SHARON SPRINGS7083 ft.NN
NIOBRARA7132 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/31/2019                 Interval Top: 7619 ft.    Interval Bottom: 17449 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2019Treatment End Date:4/12/2019
Treatment Summary:Plug and perf completion type, 49 stages. 304417 bbl of slickwater and gel. 1128 bbl of 15% HCL acid used. 11668999 lbs proppant: 674340 lbs of 100 mesh, 10994659 lbs 20/40.
Total fluid used in treatment (bbls):305545Max pressure during treatment (psi):8345
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):1128Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4613
Fresh water used in treatment (bbls):304417Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11668999Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7231 ft.
Tubing Packer Depth:7210 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 303
BBLS_OIL 378
BTU_GAS 1000
CALC_BBLS_H2O 303
CALC_BBLS_OIL 378
CALC_GOR 2995
CALC_MCF_GAS 1132
CASING_PRESS 1700
GRAVITY_OIL 49
MCF_GAS 1132
TUBING_PRESS 2158
Perforation Data:
Interval Top:7619 ft.# Of Holes:1764
Interval Bottom:17449 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9203
Total Gas Produced (MCF)62238
GOR6762
GOR DeterminationBOE
Average BOE per Day54.320
Average MCFE per Day315.051

 Federal Financial Assurance  i 

 Tribal Well  i No