Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47697
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:Bost Farm #41N-8C-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:456991LocationID:456832
Municipality/County:GREELEY / WELD #123Location:SWNW 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1377FNL  941 FWLLat/Long: 40.417756 / -104.829011Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417756 / -104.829011Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/22/2019
End Date: 4/30/2019
Reported: 6/18/2019
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 17635 ft.    Vertical TD: 7280 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 1011 FNL  150 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 974 FNL  460 FEL
Proposed Depth/Form:17548 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17548 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2157, Top: , Bottom: 17548 ft.

Wellbore Completed
Completion Date:11/27/2018
Spud Date:10/10/2018Spud Date Is:ACTUAL
Measured TD:17635 ft.Measured PB depth:17518 ft.
True Vertical TD:7280 ft.True Vertical PB depth:7280 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 989 FNL  168 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 1004 FNL  390 FEL
Log Types:MWD/LWD, CBL, MUD, (RES/GR in API: 05-123-47691)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1792 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 692, Top: 0 ft., Bottom: 1792 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17635 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2382, Top: 0 ft., Bottom: 17518 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3751 ft.NN
SUSSEX4251 ft.NN
SHANNON4433 ft.NN
SHARON SPRINGS6987 ft.NN
NIOBRARA7032 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 7593 ft.    Interval Bottom: 17448 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/28/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/22/2019Treatment End Date:4/30/2019
Treatment Summary:Plug and perf completion type, 49 stages. 271130 bbl of slickwater and gel. 1174 bbl of 15% HCL acid used. 11799100 lbs proppant: 539060 lbs of 100 mesh, 9045000 lbs 20/40, 2215040 lbs 40/70 proppant.
Total fluid used in treatment (bbls):272304Max pressure during treatment (psi):8384
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):1174Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3275
Fresh water used in treatment (bbls):271130Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11799100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7209 ft.
Tubing Packer Depth:7188 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 176
BBLS_OIL 370
BTU_GAS 1000
CALC_BBLS_H2O 176
CALC_BBLS_OIL 370
CALC_GOR 3092
CALC_MCF_GAS 1144
CASING_PRESS 838
GRAVITY_OIL 49
MCF_GAS 1144
TUBING_PRESS 1902
Perforation Data:
Interval Top:7593 ft.# Of Holes:1764
Interval Bottom:17448 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4239
Total Gas Produced (MCF)20919
GOR4934
GOR DeterminationBOE
Average BOE per Day21.687
Average MCFE per Day125.781

 Federal Financial Assurance  i 

 Tribal Well  i No