Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47695
Well Classification: OW Status: PR - 6/1/2023
Well Name/No:Bost Farm #40C-8-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2023
FacilityID:456989LocationID:456832
Municipality/County:GREELEY / WELD #123Location:SWNW 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4880 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1517FNL  939 FWLLat/Long: 40.417372 / -104.829015Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417372 / -104.829016Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/12/2019
End Date: 4/22/2019
Reported: 6/18/2019
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2023             Measured TD: 17820 ft.    Vertical TD: 7384 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 2589 FNL  174 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 2531 FNL  413 FEL
Proposed Depth/Form:17750 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17750 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2187, Top: , Bottom: 17750 ft.

Wellbore Completed
Completion Date:1/9/2019
Spud Date:9/26/2018Spud Date Is:ACTUAL
Measured TD:17820 ft.Measured PB depth:17704 ft.
True Vertical TD:7384 ft.True Vertical PB depth:7385 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 2589 FNL  174 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 2531 FNL  413 FEL
Log Types:MWD/LWD, CBL, MUD, (RES/GR in API: 05-123-47691)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1811 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 0 ft., Bottom: 1811 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17789 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2450, Top: 1760 ft., Bottom: 17699 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3743 ft.NN
SUSSEX4280 ft.NN
SHANNON4871 ft.NN
SHARON SPRINGS7113 ft.NN
NIOBRARA7136 ft.NN
FORT HAYS7681 ft.NN
CODELL7767 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/21/2020                 Interval Top: 9134 ft.    Interval Bottom: 9834 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2020Treatment End Date:N/A
Treatment Summary:Perforation interval: 9134'-9834'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9134 ft.# Of Holes:1764
Interval Bottom:9834 ft.Hole Size:0.46 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 6/1/2023                  Interval Top: 7808 ft.    Interval Bottom: 17634 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/12/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/12/2019Treatment End Date:4/22/2019
Treatment Summary:Plug and perf completion type, 49 stages. 238507 bbl of slickwater and gel. 95 bbl of 15% HCL acid used. 10097890 lbs proppant:298500 lbs of 100 mesh, 219670 lbs 20/40, 9579720 lbs 40/70 proppant.
Total fluid used in treatment (bbls):238602Max pressure during treatment (psi):7235
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3868
Fresh water used in treatment (bbls):238507Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10097890Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7425 ft.
Tubing Packer Depth:7403 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/30/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 308
BBLS_OIL 339
BTU_GAS 1000
CALC_BBLS_H2O 308
CALC_BBLS_OIL 339
CALC_GOR 4029
CALC_MCF_GAS 1366
CASING_PRESS 2
GRAVITY_OIL 49
MCF_GAS 1366
TUBING_PRESS 1717
Perforation Data:
Interval Top:7808 ft.# Of Holes:1764
Interval Bottom:17634 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/21/2020                 Interval Top: 7808 ft.    Interval Bottom: 17634 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2020Treatment End Date:N/A
Treatment Summary:Perforation intervals: 7808'-9084', 9884'-17634'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7808 ft.# Of Holes:1764
Interval Bottom:17634 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2639
Total Gas Produced (MCF)34918
GOR13231
GOR DeterminationBOE
Average BOE per Day23.695
Average MCFE per Day137.421

 Federal Financial Assurance  i 

 Tribal Well  i No