Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47692
Well Classification: OW Status: PR - 7/1/2022
Well Name/No:Bost Farm #26N-8B-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2022
FacilityID:456986LocationID:456832
Municipality/County:GREELEY / WELD #123Location:NWNW 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1297FNL  942 FWLLat/Long: 40.417976 / -104.829009Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417973 / -104.829009Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/8/2019
End Date: 5/15/2019
Reported: 6/18/2019
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2022             Measured TD: 17610 ft.    Vertical TD: 7231 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 117 FNL  150 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 77 FNL  460 FEL
Proposed Depth/Form:17573 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 742, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17573 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2161, Top: , Bottom: 17573 ft.

Wellbore Completed
Completion Date:10/31/2018
Spud Date:10/13/2018Spud Date Is:ACTUAL
Measured TD:17610 ft.Measured PB depth:17493 ft.
True Vertical TD:7231 ft.True Vertical PB depth:7231 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 116 FNL  172 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 44 FNL  401 FEL
Log Types:MWD/LWD, CBL, MUD, (RES/GR in API: 05-123-47691)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1788 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 691, Top: 0 ft., Bottom: 1788 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17580 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2383, Top: 0 ft., Bottom: 17491 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3763 ft.NN
SUSSEX4311 ft.NN
SHANNON4890 ft.NN
SHARON SPRINGS7098 ft.NN
NIOBRARA7152 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/1/2022                  Interval Top: 7605 ft.    Interval Bottom: 17423 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/13/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/8/2019Treatment End Date:5/16/2019
Treatment Summary:Plug and perf completion type 49 stages. 303009 bbl of slickwater and gel. 1174 bbl of 15% HCL acid used. 17650226 lbs of proppant: 291309 lbs of 100 mesh, 2928130 lbs 40/70, 14430787 lbs 30/50 proppant.
Total fluid used in treatment (bbls):304183Max pressure during treatment (psi):7953
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):1174Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5019
Fresh water used in treatment (bbls):303009Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17650226Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7263 ft.
Tubing Packer Depth:7242 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/30/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 309
BBLS_OIL 340
BTU_GAS 1000
CALC_BBLS_H2O 309
CALC_BBLS_OIL 340
CALC_GOR 1591
CALC_MCF_GAS 541
CASING_PRESS 1050
GRAVITY_OIL 49
MCF_GAS 541
TUBING_PRESS 2300
Perforation Data:
Interval Top:7605 ft.# Of Holes:1764
Interval Bottom:17423 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4149
Total Gas Produced (MCF)6111
GOR1472
GOR DeterminationBOE
Average BOE per Day14.219
Average MCFE per Day82.453

 Federal Financial Assurance  i 

 Tribal Well  i No