Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47691
Well Classification: OW Status: PR - 2/1/2023
Well Name/No:Bost Farm #26C-8-L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:456985LocationID:456832
Municipality/County:GREELEY / WELD #123Location:NWNW 7 5N66W 6
Field:WATTENBERG - #90750Elevation:4881 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1317FNL  941 FWLLat/Long: 40.417921 / -104.829009Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.417921 / -104.829009Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/8/2019
End Date: 5/15/2019
Reported: 6/18/2019
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2023             Measured TD: 17765 ft.    Vertical TD: 7388 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/28/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 66W Footage: 342 FNL  150 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66W Footage: 299 FNL  460 FEL
Proposed Depth/Form:17709 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: , Unit Acreage: 702, Drill Unit: GWA
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 702, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 531, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17709 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2181, Top: , Bottom: 17709 ft.

Wellbore Completed
Completion Date:11/6/2018
Spud Date:10/12/2018Spud Date Is:ACTUAL
Measured TD:17765 ft.Measured PB depth:17651 ft.
True Vertical TD:7388 ft.True Vertical PB depth:7388 ft.
Top PZ Location:Sec:7 Twp: 5N 66WFootage: 357 FNL  315 FWL
Bottom Hole Location:Sec:8 Twp: 5N 66WFootage: 300 FNL  413 FEL
Log Types:MWD/LWD, CBL, MUD, RES/GR
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1790 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 693, Top: 0 ft., Bottom: 1790 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17736 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2402, Top: 0 ft., Bottom: 17646 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3733 ft.NN
SUSSEX4275 ft.NN
SHANNON4896 ft.NN
SHARON SPRINGS7013 ft.NN
NIOBRARA7052 ft.NN
FORT HAYS7524 ft.NN
CODELL7592 ft.NN
CARLILE13277 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/22/2020                 Interval Top: 8029 ft.    Interval Bottom: 12781 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/22/2020Treatment End Date:N/A
Treatment Summary:Perforated intervals: 8029'-8091', 12331'-12781',
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8029 ft.# Of Holes:1404
Interval Bottom:12781 ft.Hole Size:0.46 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 2/1/2023                  Interval Top: 7911 ft.    Interval Bottom: 17581 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/20/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/8/2019Treatment End Date:5/15/2019
Treatment Summary:Plug and perf completion type, 39 stages. 186582 bbl of slickwater and gel. 47 bbl of 15% HCL acid used. 7152989 lbs proppant: 243640 lbs of 100 mesh, 6689829 lbs 40/70, 219520 lbs 30/50 proppant.
Total fluid used in treatment (bbls):186629Max pressure during treatment (psi):7431
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3695
Fresh water used in treatment (bbls):186582Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7152989Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7346 ft.
Tubing Packer Depth:7325 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/28/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 313
BBLS_OIL 339
BTU_GAS 1000
CALC_BBLS_H2O 313
CALC_BBLS_OIL 339
CALC_GOR 3180
CALC_MCF_GAS 1078
CASING_PRESS 50
GRAVITY_OIL 49
MCF_GAS 1078
TUBING_PRESS 1962
Perforation Data:
Interval Top:7911 ft.# Of Holes:1404
Interval Bottom:17581 ft.Hole Size:0.46 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/22/2020                 Interval Top: 7911 ft.    Interval Bottom: 17581 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/22/2020Treatment End Date:N/A
Treatment Summary:Perforated intervals: 7911'-7971', 8151'-12281', 12831'-13128', 14643'-17581'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7911 ft.# Of Holes:1404
Interval Bottom:17581 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5282
Total Gas Produced (MCF)71704
GOR13575
GOR DeterminationBOE
Average BOE per Day48.173
Average MCFE per Day279.403

 Federal Financial Assurance  i 

 Tribal Well  i No