|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/23/2019 Measured TD: 17665 ft. Vertical TD: 7744 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/23/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/23/2020 | | Proposed Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 706 FNL 540 FEL | | Bottom Hole Location: | Sec:27 Twp: 1N 68W | Footage: 466 FSL 528 FEL | | Proposed Depth/Form: | 17595 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2533 , Unit Acreage: 1920, Drill Unit: S22&27:E2;S23&26:ALL | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 500 ft., Weight: 54.5 , Citings Type: PLANNED | | Cement: | Sacks: 538, Top: 0 ft., Bottom: 500 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2509 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 635, Top: 0 ft., Bottom: 2509 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17595 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2559, Top: , Bottom: 17595 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/10/2018 | | Spud Date: | 11/8/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 17665 ft. | Measured PB depth: | 17641 ft. | | True Vertical TD: | 7744 ft. | True Vertical PB depth: | 7744 ft. | | Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 706 FNL 540 FEL | | Bottom Hole Location: | Sec:27 Twp: 1N 68W | Footage: 466 FSL 528 FEL | | Log Types: | Deep Conductor CBL, Production CBL, MWD, MUD (DIL in 123-21857) | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 522 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 182, Top: 342 ft., Bottom: 522 ft., Determination Method: CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2535 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 665, Top: 0 ft., Bottom: 2540 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17655 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2585, Top: 2510 ft., Bottom: 17665 ft., Determination Method: CBL | | Additional Cement: | String Type: CONDUCTOR , Top: 64 ft., Depth: 325 ft., Bottom: 331 ft., Sacks: 168, Method: DV TOOL | | Additional Cement: | String Type: CONDUCTOR , Top: 0 ft., Depth: 64 ft., Bottom: 64 ft., Sacks: 174, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4862 ft. | | N | N | | SHANNON | 5504 ft. | | N | N | | SHARON SPRINGS | 7819 ft. | | N | N | | NIOBRARA | 7859 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 5/23/2019 Interval Top: 8253 ft. Interval Bottom: 17628 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/5/2019 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/26/2019 | Treatment End Date: | 4/20/2019 | | Treatment Summary: | 378173 bbls of water, 560 bbls of additives (FRP-4CS, SAFE-BFH-2, XLS-3Z,BHL-68W, ACI-97, ASF-67, LGA-3J) and 24 bbl HCL in a 60 stage frac with 8639787 lbs of silica quartz proppant
| | Total fluid used in treatment (bbls): | 378757 | Max pressure during treatment (psi): | 8844 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 60 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 20335 | | Fresh water used in treatment (bbls): | 378733 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 8639787 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7938 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/23/2019 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 442 | | BBLS_OIL | 442 | | BTU_GAS | 1304 | | CALC_BBLS_H2O | 442 | | CALC_BBLS_OIL | 442 | | CALC_GOR | 2163 | | CALC_MCF_GAS | 956 | | CASING_PRESS | 2650 | | GRAVITY_OIL | 42 | | MCF_GAS | 956 | | TUBING_PRESS | 1625 |
| | Perforation Data: | | Interval Top: | 8253 ft. | # Of Holes: | 1406 | | Interval Bottom: | 17628 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 7054 |
| Total Gas Produced (MCF) | 82844 |
| GOR | 11744 |
| GOR Determination | BOE |
| Average BOE per Day | 58.413 |
| Average MCFE per Day | 338.809 |
| Federal Financial Assurance | i | |
|
|