|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/19/2019 Measured TD: 17883 ft. Vertical TD: 8018 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/19/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/23/2020 | Prop Depth/Form: | 17958 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NFCC , Formation: NIOBRARA-FORT HAYS-CODELL-CARLILE , Order: 407-2533 , Unit Acreage: 1920, Drill Unit: S22&27:E2;S23&26:ALL | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 500 ft., Weight: 54.5 , Citings Type: PLANNED | Cement: | Sacks: 538, Top: 0 ft., Bottom: 500 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2512 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 636, Top: 0 ft., Bottom: 2512 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17958 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2588, Top: , Bottom: 17958 ft. |
| | |
Wellbore Completed | Completion Date: | 12/2/2018 | Spud Date: | 11/9/2018 | Spud Date Is: | ACTUAL | Measured TD: | 17883 ft. | Measured PB depth: | 17855 ft. | True Vertical TD: | 8018 ft. | True Vertical PB depth: | 8018 ft. | Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 484 FNL 392 FEL | Depth | Bottom Hole Location: | Sec:27 Twp: 1N 68W | Footage: 478 FSL 448 FEL | Depth | Log Types: | Deep Conductor CBL, Production CBL, MWD, MUD (DIL in API 123-21857) | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 518 ft., Weight: 54.5 , Citings Type: ACTUAL | Cement: | Sacks: 181, Top: , Bottom: 518 ft., Determination Method: CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2568 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 665, Top: 0 ft., Bottom: 2568 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 17869 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2545, Top: 1550 ft., Bottom: 17883 ft., Determination Method: CBL | Additional Cement: | String Type: CONDUCTOR , Top: 20 ft., Depth: 325 ft., Bottom: 330 ft., Sacks: 325, Method: DV TOOL | Additional Cement: | String Type: CONDUCTOR , Top: 0 ft., Depth: 20 ft., Bottom: 20 ft., Sacks: 11, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4848 ft. | | N | N | SHANNON | 5495 ft. | | N | N | SHARON SPRINGS | 7767 ft. | | N | N | NIOBRARA | 7809 ft. | | N | N | FORT HAYS | 8415 ft. | | N | N | CODELL | 8515 ft. | | N | N | CARLILE | 11806 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 9/5/2019 Interval Top: 10806 ft. Interval Bottom: 12126 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/5/2019 | Treatment End Date: | N/A | Treatment Summary: | Carlile: 10806-12126
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 10806 ft. | # Of Holes: | 805 | Interval Bottom: | 12126 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 9/5/2019 Interval Top: 8515 ft. Interval Bottom: 17843 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/5/2019 | Treatment End Date: | N/A | Treatment Summary: | Codell: 8515-10018, 10690-10782, 10823-11805, 12127-13396, 16388-17396, 17524-17843
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8515 ft. | # Of Holes: | 805 | Interval Bottom: | 17843 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: OW Status: CM - 9/5/2019 Interval Top: 8415 ft. Interval Bottom: 17523 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/5/2019 | Treatment End Date: | N/A | Treatment Summary: | Ft Hays: 8415-8514, 10496-10689, 10783-10822, 13397-16387, 17397-17523
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8415 ft. | # Of Holes: | 805 | Interval Bottom: | 17523 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/5/2019 Interval Top: 8223 ft. Interval Bottom: 10495 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/5/2019 | Treatment End Date: | N/A | Treatment Summary: | Nio: 8223-8414, 10019-10495
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 8223 ft. | # Of Holes: | 805 | Interval Bottom: | 10495 ft. | Hole Size: | |
|
Formation NFCC Formation Classification: OW Status: PR - 5/19/2019 Interval Top: 8223 ft. Interval Bottom: 17843 ft. Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE | 1st Production Date: | 6/5/2019 | Choke Size: | | Formation Name: | NIOBRARA-FORT HAYS-CODELL-CARLILE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 3/25/2019 | Treatment End Date: | 4/11/2019 | Treatment Summary: | 222950 bbls of water, 226 bbls of additives (FRP-4CS, SAFE-BFH-2, XLS-3Z,BHL-68W, ACI-97, ASF-67, LGA-3J) and 18 bbl HCL in a 35 stage frac with 5770090 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 223194 | Max pressure during treatment (psi): | 8708 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 35 | Total acid used in treatment (bbls): | 18 | Min frac gradient (psi/ft): | 0.83 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 15213 | Fresh water used in treatment (bbls): | 223176 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 5770090 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8304 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/19/2019 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 702 | BBLS_OIL | 499 | BTU_GAS | 1288 | CALC_BBLS_H2O | 702 | CALC_BBLS_OIL | 499 | CALC_GOR | 2433 | CALC_MCF_GAS | 1214 | CASING_PRESS | 2800 | GRAVITY_OIL | 42 | MCF_GAS | 1214 | TUBING_PRESS | 1950 |
| Perforation Data: | Interval Top: | 8223 ft. | # Of Holes: | 805 | Interval Bottom: | 17843 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 19888 |
Total Gas Produced (MCF) | 116994 |
GOR | 5882 |
GOR Determination | BOE |
Average BOE per Day | 109.472 |
Average MCFE per Day | 634.975 |
Federal Financial Assurance | i | |
|
|