|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/7/2020 Measured TD: 17097 ft. Vertical TD: 6949 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/7/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/23/2020 | | Proposed Top PZ Location: | Sec:12 Twp: 5N 67W | Footage: 1455 FNL 150 FEL | | Bottom Hole Location: | Sec:11 Twp: 5N 67W | Footage: 1407 FNL 460 FWL | | Proposed Depth/Form: | 17184 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2488 , Unit Acreage: 2250, Drill Unit: Sec 7, 8, 11, 12 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 35, Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 531, Top: 0 ft., Bottom: 1750 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17184 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2117, Top: , Bottom: 17184 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/30/2019 | | Spud Date: | 3/10/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 17097 ft. | Measured PB depth: | 16976 ft. | | True Vertical TD: | 6949 ft. | True Vertical PB depth: | 6950 ft. | | Top PZ Location: | Sec:12 Twp: 5N 67W | Footage: 1329 FNL 163 FEL | | Bottom Hole Location: | Sec:11 Twp: 5N 67W | Footage: 1410 FNL 388 FWL | | Log Types: | MWD/LWD, CBL, Mud Log (RES/GR in API: 05-123-47691) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL | | Cement: | Sacks: 38, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1799 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 715, Top: 0 ft., Bottom: 1799 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17062 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2251, Top: 89 ft., Bottom: 17097 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3665 ft. | | N | N | | SUSSEX | 4367 ft. | | N | N | | SHANNON | 4772 ft. | | N | N | | NIOBRARA | 7000 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 5/7/2020 Interval Top: 7230 ft. Interval Bottom: 16907 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/30/2020 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/12/2020 | Treatment End Date: | 3/30/2020 | | Treatment Summary: | 54 Stage Plug and Perf
Total Fluid: 68,027 bbls
Slickwater Fluid: 67,360 bbls
Gel Fluid: 92143
15% HCl Acid: 667 bbls
Total Proppant: 10,334,000 lbs
Silica Proppant: 10,334,000 lbs
Method for determiningflowback: measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 160170 | Max pressure during treatment (psi): | 4690 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 54 | | Total acid used in treatment (bbls): | 667 | Min frac gradient (psi/ft): | 0.99 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 8582 | | Fresh water used in treatment (bbls): | 159503 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 10334000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7046 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/2020 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 138 | | BBLS_OIL | 309 | | BTU_GAS | 1334 | | CALC_BBLS_H2O | 138 | | CALC_BBLS_OIL | 309 | | CALC_GOR | 1489 | | CALC_MCF_GAS | 460 | | CASING_PRESS | 2292 | | GRAVITY_OIL | 52 | | MCF_GAS | 460 | | TUBING_PRESS | 1898 |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 1944 | | Interval Bottom: | 16907 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 4484 |
| Total Gas Produced (MCF) | 111496 |
| GOR | 24865 |
| GOR Determination | MCFE |
| Average BOE per Day | 65.094 |
| Average MCFE per Day | 377.536 |
| Federal Financial Assurance | i | |
|
|