Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47612
Well Classification: OW Status: PR - 9/18/2019
Well Name/No:DOROTHY STATE #LG16-757
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/18/2019
FacilityID:456693LocationID:456690
County:WELD #123Location:NENW 9 8N59W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4855 ft.
Planned Location:335FNL  1433 FWLLat/Long: 40.683200 / -103.985650Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.683207 / -103.985668Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/31/2019
End Date: 2/18/2019
Reported: 4/8/2019
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/18/2019             Measured TD: 16692 ft.    Vertical TD: 6074 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/18/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/19/2020
Prop Depth/Form:16743 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-836 , Unit Acreage: 1280, Drill Unit: Sec 9 & Sec 16: ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 144, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 658, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16743 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1814, Top: , Bottom:

Wellbore Completed
Completion Date:11/20/2018
Spud Date:11/15/2018Spud Date Is:ACTUAL
Measured TD:16692 ft.Measured PB depth:16631 ft.
True Vertical TD:6074 ft.True Vertical PB depth:6075 ft.
Top PZ Location:Sec:9 Twp: 8N 59WFootage: 203 FNL  2134 FWLDepth
Bottom Hole Location:Sec:16 Twp: 8N 59WFootage: 144 FSL  2183 FWLDepth
Log Types:CBL, MWD/LWD, (Resistivity in 123-47611)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1934 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 668, Top: 0 ft., Bottom: 1934 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16679 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1677, Top: 3338 ft., Bottom: 16679 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3350 ft.
SUSSEX4061 ft.
TEEPEE BUTTES5394 ft.
SHARON SPRINGS6096 ft.
NIOBRARA6152 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/18/2019                 Interval Top: 6313 ft.    Interval Bottom: 16543 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/12/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/31/2019Treatment End Date:2/18/2019
Treatment Summary:Niobrara completed with: 813 bbls 15% HCl, 510,307 bbls slurry, 1,166,387 lbs 100 mesh, 16,318,889 lbs 40/70
Total fluid used in treatment (bbls):511120Max pressure during treatment (psi):8106
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):813Min frac gradient (psi/ft):0.97
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5043
Fresh water used in treatment (bbls):510307Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17485276Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1072
BBLS_OIL 203
BTU_GAS 1322
CALC_BBLS_H2O 1072
CALC_BBLS_OIL 203
CALC_GOR 493
CALC_MCF_GAS 100
CASING_PRESS 3
GRAVITY_OIL 42
MCF_GAS 100
TUBING_PRESS 593
Perforation Data:
Interval Top:6313 ft.# Of Holes:1344
Interval Bottom:16543 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)14597
Total Gas Produced (MCF)58768
GOR4026
GOR DeterminationBOE
Average BOE per Day67.575
Average MCFE per Day391.928

 Federal Financial Assurance  i 

 Tribal Well  i No