Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47586
Well Classification: OW Status: PR - 8/15/2019
Well Name/No:BAJA BERG #35-2HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/15/2019
FacilityID:456599LocationID:456589
County:WELD #123Location:NESW 35 2N67W 6
Field:WATTENBERG - #90750Elevation:4931 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1748FSL  2442 FWLLat/Long: 40.092311 / -104.858950Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.092310 / -104.858951Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/24/2019
End Date: 6/1/2019
Reported: 7/31/2019
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/15/2019             Measured TD: 17807 ft.    Vertical TD: 7543 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/15/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/12/2020
Proposed Top PZ Location:Sec:35 Twp: 2N 67W Footage: 2349 FSL  2408 FEL
Bottom Hole Location:Sec:31 Twp: 2N 66W Footage: 2327 FSL  2108 FWL
Proposed Depth/Form:17819 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17809 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2112, Top: , Bottom: 17809 ft.

Wellbore Completed
Completion Date:1/1/2019
Spud Date:9/18/2018Spud Date Is:ACTUAL
Measured TD:17807 ft.Measured PB depth:17791 ft.
True Vertical TD:7543 ft.True Vertical PB depth:7543 ft.
Top PZ Location:Sec:35 Twp: 2N 67WFootage: 2367 FSL  2363 FEL
Bottom Hole Location:Sec:31 Twp: 2N 66WFootage: 2358 FSL  2103 FWL
Log Types:CBL, MWD/LWD, GR/CNL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1881 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 703, Top: 0 ft., Bottom: 1881 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17795 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1700, Top: 1200 ft., Bottom: 17807 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1256 ft.
PARKMAN4186 ft.
SUSSEX4534 ft.
SHARON SPRINGS7326 ft.
NIOBRARA7408 ft.
FORT HAYS7968 ft.
CODELL8061 ft.
CARLILE15368 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 9/3/2019                  Interval Top: 15246 ft.    Interval Bottom: 16019 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2019Treatment End Date:N/A
Treatment Summary:15246-15502, 15812-15821, 15841-16019
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:15246 ft.# Of Holes:567
Interval Bottom:16019 ft.Hole Size:0.44 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/3/2019                  Interval Top: 11657 ft.    Interval Bottom: 11910 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2019Treatment End Date:N/A
Treatment Summary:11657-11910
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:11657 ft.# Of Holes:567
Interval Bottom:11910 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/3/2019                  Interval Top: 8715 ft.    Interval Bottom: 17718 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2019Treatment End Date:N/A
Treatment Summary:8715-8755, 11201-11657, 11910-13313, 13581-13585, 17635-17718
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8715 ft.# Of Holes:567
Interval Bottom:17718 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/3/2019                  Interval Top: 8091 ft.    Interval Bottom: 17763 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2019Treatment End Date:N/A
Treatment Summary:8091-8715, 8755-11201, 13313-13581, 13585-15246, 15502-15812, 15821-15841, 16019-17635, 17718-17763
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8091 ft.# Of Holes:567
Interval Bottom:17763 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 8/15/2019                 Interval Top: 8091 ft.    Interval Bottom: 17763 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:8/9/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/24/2019Treatment End Date:6/1/2019
Treatment Summary:PERF FROM 8091-17763 24 BBLS 15% HCL ACID, 77 BBLS 7.5% HCL ACID, 10,181 BBLS PUMP DOWN, 171,021 BBLS SLICKWATER, 181,303 BBLS TOTAL FLUID. 5,341,020 BBLS WHITE 40/70 OTTAWA/ST. PETERS. 5,341,020 BBLS TOTAL PROPPANT.
Total fluid used in treatment (bbls):181303Max pressure during treatment (psi):7765
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):101Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):575Total flowback volume recovered (bbls):1356
Fresh water used in treatment (bbls):180627Disposition method For flowback:RECYCLE
Total proppant used (lbs):5341020Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7676 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/15/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 209
BBLS_OIL 81
BTU_GAS 1279
CALC_BBLS_H2O 209
CALC_BBLS_OIL 81
CALC_GOR 420
CALC_MCF_GAS 34
CASING_PRESS 2600
GRAVITY_OIL 51
MCF_GAS 34
TUBING_PRESS 2400
Perforation Data:
Interval Top:8091 ft.# Of Holes:567
Interval Bottom:17763 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)7405
Total Gas Produced (MCF)162305
GOR21918
GOR DeterminationMCFE
Average BOE per Day96.789
Average MCFE per Day561.355

 Federal Financial Assurance  i 

 Tribal Well  i No