|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/12/2019 Measured TD: 17892 ft. Vertical TD: 7529 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/12/2019 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/12/2020 | | Proposed Top PZ Location: | Sec:35 Twp: 2N 67W | Footage: 386 FSL 2503 FEL | | Bottom Hole Location: | Sec:31 Twp: 2N 66W | Footage: 380 FSL 2123 FWL | | Proposed Depth/Form: | 17815 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17805 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2111, Top: , Bottom: 17805 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/9/2019 | | Spud Date: | 9/18/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 17892 ft. | Measured PB depth: | 17839 ft. | | True Vertical TD: | 7529 ft. | True Vertical PB depth: | 7529 ft. | | Top PZ Location: | Sec:35 Twp: 2N 67W | Footage: 386 FSL 2503 FEL | | Bottom Hole Location: | Sec:31 Twp: 2N 66W | Footage: 380 FSL 2123 FWL | | Log Types: | CBL, MWD/LWD. (GR/RES in API 123-21077). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1889 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 706, Top: 0 ft., Bottom: 1889 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 6599 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 360, Top: 2652 ft., Bottom: 6599 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6385 ft., Depth: 17885 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 6385 ft., Bottom: 17892 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1260 ft. | | | | | PARKMAN | 4211 ft. | | | | | SUSSEX | 4560 ft. | | | | | SHARON SPRINGS | 7338 ft. | | | | | NIOBRARA | 7404 ft. | | | | | FORT HAYS | 7939 ft. | | | | | CODELL | 8127 ft. | | | | | CARLILE | 8980 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 9/3/2019 Interval Top: 8981 ft. Interval Bottom: 17409 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/3/2019 | Treatment End Date: | N/A | | Treatment Summary: | 8981-9380, 12483-12750, 13290-13300, 17050-17154, 17342-17409 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 8981 ft. | # Of Holes: | 585 | | Interval Bottom: | 17409 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/3/2019 Interval Top: 8127 ft. Interval Bottom: 17342 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/3/2019 | Treatment End Date: | N/A | | Treatment Summary: | 8127-8981, 9380-11392, 11562-12483, 12750-13290, 13300-17050, 17154-17342 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8127 ft. | # Of Holes: | 585 | | Interval Bottom: | 17342 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 8/12/2019 Interval Top: 8031 ft. Interval Bottom: 17409 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 7/12/2019 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/12/2019 | Treatment End Date: | 6/20/2019 | | Treatment Summary: | PERF FROM 8031-17409
43 BBLS 15% HCL ACID ACID, 38 BBLS 7.5% HCL ACID ACID, 5,410 BBLS PUMP DOWN, 177,346 BBLS SLICKWATER, 182,837 BBLS TOTAL FLUID. 5,382,740 WHITE 40/70 OTTAWA/ST. PETERS. 5,382,740 BBLS TOTAL PROPPANT.
| | Total fluid used in treatment (bbls): | 182837 | Max pressure during treatment (psi): | 7890 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 25 | | Total acid used in treatment (bbls): | 81 | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 7478 | | Fresh water used in treatment (bbls): | 182756 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5382740 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7663 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/12/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 205 | | BBLS_OIL | 72 | | BTU_GAS | 1279 | | CALC_BBLS_H2O | 205 | | CALC_BBLS_OIL | 72 | | CALC_GOR | 2292 | | CALC_MCF_GAS | 165 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 51 | | MCF_GAS | 165 | | TUBING_PRESS | 1450 |
| | Perforation Data: | | Interval Top: | 8031 ft. | # Of Holes: | 585 | | Interval Bottom: | 17409 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 9/3/2019 Interval Top: 8031 ft. Interval Bottom: 11562 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/3/2019 | Treatment End Date: | N/A | | Treatment Summary: | 8031-8127, 11392-11562 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8031 ft. | # Of Holes: | 585 | | Interval Bottom: | 11562 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 6000 |
| Total Gas Produced (MCF) | 107555 |
| GOR | 17925 |
| GOR Determination | MCFE |
| Average BOE per Day | 67.135 |
| Average MCFE per Day | 389.367 |
| Federal Financial Assurance | i | |
|
|