Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47482
Well Classification: OW Status: PR - 3/6/2023
Well Name/No:RINN VALLEY WEST #18N-20-14C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/6/2023
FacilityID:456278LocationID:455340
County:WELD #123Location:SESE 18 2N68W 6
Field:WATTENBERG - #90750Elevation:4945 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:217FSL  1009 FELLat/Long: 40.132044 / -105.040277Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.132043 / -105.040278Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/7/2022
End Date: 12/16/2022
Reported: 1/26/2023
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/6/2023             Measured TD: 18855 ft.    Vertical TD: 6700 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/6/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/24/2020
Proposed Top PZ Location:Sec:18 Twp: 2N 68W Footage: 375 FSL  1270 FEL
Bottom Hole Location:Sec:18 Twp: 2N 68W Footage: 375 FSL  1270 FEL
Proposed Depth/Form:18828 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2458 , Unit Acreage: 1440, Drill Unit: 6:S2;7:All;18:N2,SE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18828 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2525, Top: , Bottom: 18828 ft.

Wellbore Completed
Completion Date:10/14/2022
Spud Date:6/5/2020Spud Date Is:ACTUAL
Measured TD:18855 ft.Measured PB depth:18840 ft.
True Vertical TD:6700 ft.True Vertical PB depth:6700 ft.
Top PZ Location:Sec:18 Twp: 2N 68WFootage: 2170 FNL  516 FWL
Bottom Hole Location:Sec:6 Twp: 2N 68WFootage: 2180 FSL  468 FWL
Log Types:
Log Types:CBL, MWD/LWD, (Triple Combination on 123-47175).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1621 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1621 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18840 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2935, Top: 170 ft., Bottom: 18840 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4218 ft.NN
SUSSEX4770 ft.NN
SHANNON5389 ft.NN
SHARON SPRINGS8284 ft.NN
NIOBRARA8315 ft.NN
FORT HAYS8850 ft.NN
CODELL8923 ft.NN
CARLILE9048 ft.
GREENHORN16811 ft.17522 ft.NN

Formation GRNHN                   Formation Classification:  OW                   Status:  PR - 3/6/2023                  Interval Top: 16821 ft.    Interval Bottom: 17513 ft.

 Completed Information for Formation GREENHORN
1st Production Date:2/25/2023Choke Size: 
Formation Name:GREENHORNCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/7/2022Treatment End Date:12/17/2022
Treatment Summary:Frac'd with Carlile-Codell-Fort Hays.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/6/2023Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 61
BBLS_OIL 42
BTU_GAS 1307
CALC_BBLS_H2O 61
CALC_BBLS_OIL 42
CALC_GOR 2264
CALC_MCF_GAS 96
CASING_PRESS 2648
GRAVITY_OIL 48
MCF_GAS 96
TUBING_PRESS 1808
Perforation Data:
Interval Top:16821 ft.# Of Holes:220
Interval Bottom:17513 ft.Hole Size:0.35 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/13/2023                 Interval Top: 14301 ft.    Interval Bottom: 16802 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/25/2023Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/7/2022Treatment End Date:12/17/2022
Treatment Summary:Perforated Intervals: 14301'-15738'; 15965'-16802'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14301 ft.# Of Holes:485
Interval Bottom:16802 ft.Hole Size:0.35 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/13/2023                 Interval Top: 9210 ft.    Interval Bottom: 18782 ft.

 Completed Information for Formation CODELL
1st Production Date:2/25/2023Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/7/2022Treatment End Date:12/17/2022
Treatment Summary:Perforated Intervals: 9210'-10022'; 10277'-14279'; 15754'-15949'; 17537'-18782'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9210 ft.# Of Holes:1107
Interval Bottom:18782 ft.Hole Size:0.35 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/13/2023                 Interval Top: 9130 ft.    Interval Bottom: 10266 ft.

 Completed Information for Formation CARLILE
1st Production Date:2/25/2023Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/7/2022Treatment End Date:12/17/2022
Treatment Summary:Perforated Intervals: 9130'-9191'; 10040'-10266'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9130 ft.# Of Holes:80
Interval Bottom:10266 ft.Hole Size:0.35 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 3/6/2023                  Interval Top: 9130 ft.    Interval Bottom: 18782 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:2/25/2023Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/7/2022Treatment End Date:12/17/2022
Treatment Summary:Frac'd Fort Hays-Codell-Carlile-Greenhorn with 43 stage plug and perf; 6035430 total pounds proppant pumped: 6006508 pounds 40/70 mesh and 28922 pounds 100 mesh; 221424 total bbls fluid pumped: 204714 bbls gelled fluid, 16591 bbls fresh water and 119 bbls 15% HCl acid.
Total fluid used in treatment (bbls):221424Max pressure during treatment (psi):9030
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):16591Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6035430Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8976 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/6/2023Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 547
BBLS_OIL 382
BTU_GAS 1307
CALC_BBLS_H2O 547
CALC_BBLS_OIL 382
CALC_GOR 2262
CALC_MCF_GAS 864
CASING_PRESS 2648
GRAVITY_OIL 48
MCF_GAS 864
TUBING_PRESS 1808
Perforation Data:
Interval Top:9130 ft.# Of Holes:1672
Interval Bottom:18782 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)52909
Total Gas Produced (MCF)400062
GOR7561
GOR DeterminationBOE
Average BOE per Day334.100
Average MCFE per Day1937.748

 Federal Financial Assurance  i 

 Tribal Well  i No