Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47452
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:Middlepark #18-11-1L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:456235LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4563 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:379FSL  1528 FWLLat/Long: 40.306220 / -104.371070Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.306220 / -104.371070Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/22/2024
End Date: 6/2/2024
Reported: 7/8/2024
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 16415 ft.    Vertical TD: 6286 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2025
Proposed Top PZ Location:Sec:18 Twp: 4N 62W Footage: 470 FSL  1750 FWL
Bottom Hole Location:Sec:7 Twp: 4N 62W Footage: 470 FNL  1825 FWL
Proposed Depth/Form:16252 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2340 , Unit Acreage: 1280, Drill Unit: T4N R62W Sec. 18 & 7
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16252 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1716, Top: , Bottom: 16252 ft.

Wellbore Completed
Completion Date:11/10/2022
Spud Date:7/4/2022Spud Date Is:ACTUAL
Measured TD:16415 ft.Measured PB depth:16382 ft.
True Vertical TD:6286 ft.True Vertical PB depth:6285 ft.
Top PZ Location:Sec:18 Twp: 4N 62WFootage: 470 FSL  1753 FWL
Bottom Hole Location:Sec:7 Twp: 4N 62WFootage: 443 FNL  1843 FWL
Log Types:GR/RES on 05-123-47444. CBL, MWD, Mud Log.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1721 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 1730 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16399 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2275, Top: 2120 ft., Bottom: 16415 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1572 ft.NN
PARKMAN3410 ft.NN
SUSSEX3977 ft.NN
SHANNON4672 ft.NN
SHARON SPRINGS6195 ft.NN
NIOBRARA6367 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/1/2024                  Interval Top: 6711 ft.    Interval Bottom: 16393 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/1/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/22/2024Treatment End Date:6/2/2024
Treatment Summary:478051 bbls total; 154424694 # sand total(148120 200/mesh 1556088 100/mesh 13720486 30/50); 52920 gals 15% HCL
Total fluid used in treatment (bbls):478051Max pressure during treatment (psi):8389
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):1260Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1032
Fresh water used in treatment (bbls):476791Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15424694Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6333 ft.
Tubing Packer Depth:6342 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/1/2024Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 562
BBLS_OIL 116
BTU_GAS 1405
CALC_BBLS_H2O 562
CALC_BBLS_OIL 116
CALC_GOR 862
CALC_MCF_GAS 100
GRAVITY_OIL 41
MCF_GAS 100
TUBING_PRESS 1253
Perforation Data:
Interval Top:6711 ft.# Of Holes:1323
Interval Bottom:16393 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)85485
Total Gas Produced (MCF)226880
GOR2654
GOR DeterminationBOE
Average BOE per Day341.835
Average MCFE per Day1982.663

 Federal Financial Assurance  i 

 Tribal Well  i No