Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47450
Well Classification: OW Status: PR - 9/5/2024
Well Name/No:Middlepark #18-4-1L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/5/2024
FacilityID:456233LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4563 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:242FSL  1634 FWLLat/Long: 40.305840 / -104.370690Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.305840 / -104.370690Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/17/2024
End Date: 6/30/2024
Reported: 7/9/2025
Days to report: 374
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/5/2024             Measured TD: 17125 ft.    Vertical TD: 6210 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/5/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2025
Proposed Top PZ Location:Sec:18 Twp: 4N 62W Footage: 470 FSL  1213 FEL
Bottom Hole Location:Sec:7 Twp: 4N 62W Footage: 470 FNL  1015 FEL
Proposed Depth/Form:16815 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2340 , Unit Acreage: 1280, Drill Unit: T4N R62W Sec. 18 & 7
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16815 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1800, Top: , Bottom: 16815 ft.

Wellbore Completed
Completion Date:10/17/2022
Spud Date:6/28/2022Spud Date Is:ACTUAL
Measured TD:17125 ft.Measured PB depth:17095 ft.
True Vertical TD:6210 ft.True Vertical PB depth:6210 ft.
Top PZ Location:Sec:18 Twp: 4N 62WFootage: 470 FSL  939 FEL
Bottom Hole Location:Sec:7 Twp: 4N 62WFootage: 429 FNL  813 FEL
Log Types:GR/RES on 05-123-47444. CBL, MWD, Mud Log.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1733 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 1743 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17115 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2380, Top: 2356 ft., Bottom: 17125 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1599 ft.NN
PARKMAN3718 ft.NN
SUSSEX4378 ft.NN
SHANNON5040 ft.NN
SHARON SPRINGS6863 ft.NN
NIOBRARA7050 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/5/2024                  Interval Top: 7372 ft.    Interval Bottom: 17105 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/5/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/17/2024Treatment End Date:6/30/2024
Treatment Summary:480591 bbls total; 15750830 # sand total(152453 200/mesh 1573530 100/mesh 472483 40/70 13552364 30/50); 38262 gals 15% HCL
Total fluid used in treatment (bbls):480591Max pressure during treatment (psi):8479
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):911Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):595
Fresh water used in treatment (bbls):479680Disposition method For flowback:DISPOSAL
Total proppant used (lbs):15750830Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6982 ft.
Tubing Packer Depth:6990 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2024Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 695
BBLS_OIL 326
BTU_GAS 1405
CALC_BBLS_H2O 695
CALC_BBLS_OIL 326
CALC_GOR 810
CALC_MCF_GAS 264
GRAVITY_OIL 41
MCF_GAS 264
TUBING_PRESS 1640
Perforation Data:
Interval Top:7372 ft.# Of Holes:1323
Interval Bottom:17105 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)102465
Total Gas Produced (MCF)297862
GOR2906
GOR DeterminationBOE
Average BOE per Day422.505
Average MCFE per Day2450.556

 Federal Financial Assurance  i 

 Tribal Well  i No