Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47448
Well Classification: OW Status: PR - 8/14/2024
Well Name/No:Flaherty #13-6-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/14/2024
FacilityID:456231LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4563 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:471FSL  1648 FWLLat/Long: 40.306470 / -104.370650Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.306470 / -104.370650Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/8/2024
End Date: 4/19/2024
Reported: 7/9/2025
Originally Reported: 5/2/2024
Days to report: 446
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/14/2024             Measured TD: 12060 ft.    Vertical TD: 6278 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/14/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2025
Proposed Top PZ Location:Sec:13 Twp: 4N 63W Footage: 1938 FNL  470 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63W Footage: 1939 FNL  470 FWL
Proposed Depth/Form:11903 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2372 , Unit Acreage: 640, Drill Unit: T4N R63W Sec. 13: Al
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11903 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1072, Top: , Bottom: 11903 ft.

Wellbore Completed
Completion Date:8/23/2022
Spud Date:6/15/2022Spud Date Is:ACTUAL
Measured TD:12060 ft.Measured PB depth:12020 ft.
True Vertical TD:6278 ft.True Vertical PB depth:6278 ft.
Top PZ Location:Sec:13 Twp: 4N 63WFootage: 1950 FNL  709 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63WFootage: 1944 FNL  407 FWL
Log Types:GR/RES on 05-123-47444. CBL, MWD, Mud Log.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1735 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 0 ft., Bottom: 1745 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12046 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1420, Top: 2084 ft., Bottom: 12060 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1752 ft.NN
PARKMAN3744 ft.NN
SUSSEX4475 ft.NN
SHANNON5266 ft.NN
SHARON SPRINGS7090 ft.NN
NIOBRARA7258 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/14/2024                 Interval Top: 7832 ft.    Interval Bottom: 11832 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/14/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/8/2024Treatment End Date:4/19/2024
Treatment Summary:205468 bbls total; 6371179 # sand total(61050 200/mesh 717694 100/mesh 40/70 5592435 30/50); 28980 gals HCL
Total fluid used in treatment (bbls):205469Max pressure during treatment (psi):10466
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):690Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):458
Fresh water used in treatment (bbls):204779Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6371179Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7213 ft.
Tubing Packer Depth:7222 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/14/2024Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 191
BBLS_OIL 269
BTU_GAS 1405
CALC_BBLS_H2O 191
CALC_BBLS_OIL 269
CALC_GOR 740
CALC_MCF_GAS 199
GRAVITY_OIL 41
MCF_GAS 199
TUBING_PRESS 805
Perforation Data:
Interval Top:7832 ft.# Of Holes:567
Interval Bottom:11832 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)25998
Total Gas Produced (MCF)130264
GOR5010
GOR DeterminationBOE
Average BOE per Day132.982
Average MCFE per Day771.295

 Federal Financial Assurance  i 

 Tribal Well  i No