Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47446
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:Middlepark #18-5-4L
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:1026.9
Facility Status:PRStatus Date9/1/2024
FacilityID:456229LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4558 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:301FSL  1588 FWLLat/Long: 40.306010 / -104.370850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.306010 / -104.370860Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/11/2018
End Date: 10/22/2018
Reported: 11/13/2018
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 16532 ft.    Vertical TD: 6484 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/24/2020
Proposed Top PZ Location:Sec:18 Twp: 4N 62W Footage: 470 FSL  1338 FWL
Bottom Hole Location:Sec:7 Twp: 4N 62W Footage: 470 FNL  1338 FWL
Proposed Depth/Form:16483 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2340 , Unit Acreage: 1280, Drill Unit: S. 7 & 18: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 878, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16483 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2213, Top: , Bottom: 16483 ft.

Wellbore Completed
Completion Date:9/29/2018
Spud Date:9/12/2018Spud Date Is:ACTUAL
Measured TD:16532 ft.Measured PB depth:16507 ft.
True Vertical TD:6484 ft.True Vertical PB depth:6484 ft.
Top PZ Location:Sec:18 Twp: 4N 62WFootage: 470 FSL  1357 FWL
Bottom Hole Location:Sec:7 Twp: 4N 62WFootage: 410 FNL  1330 FWL
Log Types:MWD, MUD, CBL/GAMMA, RESISTIVITY ON MIDDLEPARK 18-21-3L, API 05-123-47444
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 16523 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1977, Top: 1600 ft., Bottom: 16523 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3386 ft.NN
SUSSEX3964 ft.NN
SHANNON4738 ft.NN
SHARON SPRINGS6083 ft.NN
NIOBRARA6239 ft.NN
FORT HAYS6698 ft.NN
CODELL7240 ft.NN
CARLILE9047 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/13/2019                Interval Top: 9105 ft.    Interval Bottom: 15164 ft.

 Completed Information for Formation CARLILE
1st Production Date:2/20/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2018Treatment End Date:10/22/2018
Treatment Summary:CARLILE INTERVALS: 9,105'-10,031', 15,009'-15,164'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9105 ft.# Of Holes:224
Interval Bottom:15164 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/13/2019                Interval Top: 7154 ft.    Interval Bottom: 16436 ft.

 Completed Information for Formation CODELL
1st Production Date:2/20/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2018Treatment End Date:10/22/2018
Treatment Summary:CODELL INTERVALS: 7154'-8091', 10,054'-12,292', 12,815'-14,505, 15,187'-16,436.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7154 ft.# Of Holes:1248
Interval Bottom:16436 ft.Hole Size:0.4 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/1/2024                  Interval Top: 6814 ft.    Interval Bottom: 16436 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:2/20/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2018Treatment End Date:10/22/2018
Treatment Summary:Frac Summary: 60 Stages, 16,789,170 total lbs sand & 267,354 bbls fluid. Ave Rate 64 bpm, Ave PSI 5,351, Max PSI 8,595
Total fluid used in treatment (bbls):267354Max pressure during treatment (psi):8595
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:60
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):43767
Fresh water used in treatment (bbls):267235Disposition method For flowback:DISPOSAL
Total proppant used (lbs):16789170Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/19/2019Test Method:FLOWING
Hours Tested:1Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 17
BTU_GAS 1565
CALC_BBLS_H2O 192
CALC_BBLS_OIL 408
CALC_GOR 765
CALC_MCF_GAS 312
GRAVITY_OIL 42
MCF_GAS 13
TUBING_PRESS 468
Perforation Data:
Interval Top:6814 ft.# Of Holes:1920
Interval Bottom:16436 ft.Hole Size:0.4 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/13/2019                Interval Top: 6814 ft.    Interval Bottom: 14985 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:2/20/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2018Treatment End Date:10/22/2018
Treatment Summary:FORT HAYS INTERVALS: 6,814'-7,130', 8,114'-9,083', 12,316'-12,794', 14,527'-14,985'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:6814 ft.# Of Holes:448
Interval Bottom:14985 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)11153
Total Gas Produced (MCF)27922
GOR2503
GOR DeterminationBOE
Average BOE per Day43.945
Average MCFE per Day254.897

 Federal Financial Assurance  i 

 Tribal Well  i No