Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47445
Well Classification: OW Status: PR - 8/27/2024
Well Name/No:Flaherty #13-12-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/27/2024
FacilityID:456228LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4536 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:354FSL  1738 FWLLat/Long: 40.306150 / -104.370320Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.306150 / -104.370320Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 4/28/2024
Reported: 7/8/2024
Days to report: 71
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/27/2024             Measured TD: 11482 ft.    Vertical TD: 6243 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/27/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2025
Proposed Top PZ Location:Sec:13 Twp: 4N 63W Footage: 1219 FSL  470 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63W Footage: 1219 FSL  470 FWL
Proposed Depth/Form:11302 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2372 , Unit Acreage: 640, Drill Unit: T4N R63W Sec. 13: Al
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11302 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 983, Top: , Bottom: 11302 ft.

Wellbore Completed
Completion Date:7/26/2022
Spud Date:6/22/2022Spud Date Is:ACTUAL
Measured TD:11482 ft.Measured PB depth:11443 ft.
True Vertical TD:6243 ft.True Vertical PB depth:6243 ft.
Top PZ Location:Sec:13 Twp: 4N 63WFootage: 1214 FSL  494 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63WFootage: 1212 FSL  402 FWL
Log Types:GR/RES on 05-123-47444. CBL, MWD, Mud Log.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1720 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 0 ft., Bottom: 1736 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11471 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1330, Top: 1628 ft., Bottom: 11482 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE1744 ft.NN
PARKMAN3577 ft.NN
SUSSEX4170 ft.NN
SHANNON4902 ft.NN
SHARON SPRINGS6532 ft.NN
NIOBRARA6623 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/27/2024                 Interval Top: 7024 ft.    Interval Bottom: 11384 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/27/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:4/28/2024
Treatment Summary:216056 bbls total; 6989755 # sand total(0 200/mesh 702418 100/mesh 40/70 6287337 30/50); 34944 gals HCL
Total fluid used in treatment (bbls):216056Max pressure during treatment (psi):8580
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:22
Total acid used in treatment (bbls):832Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):657
Fresh water used in treatment (bbls):215224Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6989755Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6657 ft.
Tubing Packer Depth:6665 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2024Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 393
BBLS_OIL 298
BTU_GAS 1405
CALC_BBLS_H2O 393
CALC_BBLS_OIL 298
CALC_GOR 815
CALC_MCF_GAS 243
GRAVITY_OIL 41
MCF_GAS 243
TUBING_PRESS 1131
Perforation Data:
Interval Top:7024 ft.# Of Holes:594
Interval Bottom:11384 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)31411
Total Gas Produced (MCF)152049
GOR4840
GOR DeterminationBOE
Average BOE per Day158.310
Average MCFE per Day918.203

 Federal Financial Assurance  i 

 Tribal Well  i No