Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47438
Well Classification: OW Status: PR - 8/24/2024
Well Name/No:Flaherty #13-11-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/24/2024
FacilityID:456221LocationID:442024
County:WELD #123Location:SESW 18 4N62W 6
Field:WATTENBERG - #90750Elevation:4563 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:373FSL  1723 FWLLat/Long: 40.306200 / -104.370370Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.306200 / -104.370370Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2024
End Date: 5/28/2024
Reported: 7/8/2024
Days to report: 41
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/24/2024             Measured TD: 11620 ft.    Vertical TD: 6364 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/24/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/7/2025
Proposed Top PZ Location:Sec:13 Twp: 4N 63W Footage: 1521 FSL  470 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63W Footage: 1521 FSL  470 FWL
Proposed Depth/Form:11530 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2372 , Unit Acreage: 640, Drill Unit: T4N R63W Sec. 13: Al
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1650 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 674, Top: 0 ft., Bottom: 1650 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11530 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1016, Top: , Bottom: 11530 ft.

Wellbore Completed
Completion Date:7/31/2022
Spud Date:6/21/2022Spud Date Is:ACTUAL
Measured TD:11620 ft.Measured PB depth:11582 ft.
True Vertical TD:6364 ft.True Vertical PB depth:6364 ft.
Top PZ Location:Sec:13 Twp: 4N 63WFootage: 1516 FSL  617 FEL
Bottom Hole Location:Sec:13 Twp: 4N 63WFootage: 1527 FSL  406 FWL
Log Types:GR/RES on 05-123-47444. CBL, MWD, Mud Log.
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1726 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 638, Top: 0 ft., Bottom: 1736 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11609 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1350, Top: 2842 ft., Bottom: 11620 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE1751 ft.NN
PARKMAN3579 ft.NN
SUSSEX4164 ft.NN
SHANNON4910 ft.NN
SHARON SPRINGS6477 ft.NN
NIOBRARA6593 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/24/2024                 Interval Top: 7491 ft.    Interval Bottom: 11491 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/24/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/19/2024Treatment End Date:4/28/2024
Treatment Summary:226611 bbls total; 7039513 # sand total (734882 100/mesh 40/70 6304631 30/50); 42336 gals 15% HCL
Total fluid used in treatment (bbls):226611Max pressure during treatment (psi):8813
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):1005Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1698
Fresh water used in treatment (bbls):225605Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7039513Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6730 ft.
Tubing Packer Depth:6739 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/24/2024Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 455
BBLS_OIL 215
BTU_GAS 1405
CALC_BBLS_H2O 455
CALC_BBLS_OIL 215
CALC_GOR 833
CALC_MCF_GAS 179
GRAVITY_OIL 41
MCF_GAS 179
TUBING_PRESS 1043
Perforation Data:
Interval Top:7491 ft.# Of Holes:567
Interval Bottom:11491 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)29558
Total Gas Produced (MCF)75832
GOR2565
GOR DeterminationBOE
Average BOE per Day117.174
Average MCFE per Day679.618

 Federal Financial Assurance  i 

 Tribal Well  i No