Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47402
Well Classification: OW Status: PR - 1/1/2020
Well Name/No:SLW RANCH STATE #BB07-650
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2020
FacilityID:456169LocationID:456174
County:WELD #123Location:Lot 3 7 5N63W 6
Field:WATTENBERG - #90750Elevation:4617 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1779FSL  60 FWLLat/Long: 40.411030 / -104.488790Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.411037 / -104.488801Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/26/2019
End Date: 11/11/2019
Reported: 4/13/2020
Originally Reported: 12/30/2019
Days to report: 154
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2020             Measured TD: 16846 ft.    Vertical TD: 6525 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/22/2020
Proposed Top PZ Location:Sec:7 Twp: 5N 63W Footage: 2507 FNL  438 FWL
Bottom Hole Location:Sec:8 Twp: 5N 63W Footage: 2770 FSL  252 FEL
Proposed Depth/Form:17822 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 795, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 658, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17822 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1961, Top: , Bottom: 17822 ft.

Wellbore Completed
Completion Date:9/6/2019
Spud Date:8/6/2019Spud Date Is:ACTUAL
Measured TD:16846 ft.Measured PB depth:16785 ft.
True Vertical TD:6525 ft.True Vertical PB depth:6525 ft.
Top PZ Location:Sec:7 Twp: 5N 63WFootage: 2507 FNL  438 FWL
Bottom Hole Location:Sec:8 Twp: 5N 63WFootage: 2770 FSL  252 FEL
Log Types:CBL, MWD/LWD, NEU, (RES in 123-19364)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1922 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 653, Top: 0 ft., Bottom: 1922 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16833 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1729, Top: 2464 ft., Bottom: 16846 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE389 ft.
PARKMAN3485 ft.
SUSSEX4183 ft.
SHANNON4839 ft.
TEEPEE BUTTES5924 ft.
SHARON SPRINGS6611 ft.
NIOBRARA6669 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2020                  Interval Top: 7067 ft.    Interval Bottom: 16698 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/22/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/26/2019Treatment End Date:11/11/2019
Treatment Summary:Niobrara completed with 165 bbls 28% HCl, 449,754 bbls slurry, 1,881,389 lbs 100 mesh, 22,203,885 lbs 40/70
Total fluid used in treatment (bbls):449919Max pressure during treatment (psi):8275
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:41
Total acid used in treatment (bbls):165Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):449754Disposition method For flowback:DISPOSAL
Total proppant used (lbs):24085274Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6848 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/1/2020Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 455
BBLS_OIL 799
BTU_GAS 1317
CALC_BBLS_H2O 455
CALC_BBLS_OIL 799
CALC_GOR 1189
CALC_MCF_GAS 950
CASING_PRESS 2056
GRAVITY_OIL 42
MCF_GAS 950
TUBING_PRESS 1637
Perforation Data:
Interval Top:7067 ft.# Of Holes:1260
Interval Bottom:16698 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)10267
Total Gas Produced (MCF)179307
GOR17464
GOR DeterminationMCFE
Average BOE per Day113.052
Average MCFE per Day655.721

 Federal Financial Assurance  i 

 Tribal Well  i No