Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47400
Well Classification: OW Status: PR - 10/1/2024
Well Name/No:Postle IC #09-099HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:456161LocationID:433857
Municipality/County:MEAD / WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1454FNL  551 FWLLat/Long: 40.243981 / -104.977811Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243981 / -104.977811Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/17/2020
End Date: 11/29/2020
Reported: 12/21/2020
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2024             Measured TD: 18018 ft.    Vertical TD: 7067 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/22/2020
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 1125 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 1120 FNL  495 FWL
Proposed Depth/Form:17988 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17988 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2335, Top: , Bottom: 17988 ft.

Wellbore Completed
Completion Date:6/6/2020
Spud Date:2/5/2020Spud Date Is:ACTUAL
Measured TD:18018 ft.Measured PB depth:17956 ft.
True Vertical TD:7067 ft.True Vertical PB depth:7067 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 1125 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 1120 FNL  495 FWL
Log Types:Mud log, Composite, MWD/LWD, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18018 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2325, Top: 2294 ft., Bottom: 18018 ft., Determination Method: CBL
Additional Cement:String Type: S.C. 1.1 , Top: 2540 ft., Depth: 5100 ft., Bottom: 2605 ft., Sacks: 435, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3692 ft.3732 ft.NN
SUSSEX4108 ft.4241 ft.NN
SHANNON4626 ft.4660 ft.NN
SHARON SPRINGS7076 ft.NN
NIOBRARA7194 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/1/2024                 Interval Top: 7680 ft.    Interval Bottom: 17681 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/20/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/17/2020Treatment End Date:11/29/2020
Treatment Summary:1431 bbls 15% HCL Acid; 696,631# 100 Mesh Sand; 6,609,845 # 20/40 Sand; 189,989 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):191420Max pressure during treatment (psi):4178
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):1431Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):34758
Fresh water used in treatment (bbls):189989Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7306476Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6972 ft.
Tubing Packer Depth:6954 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/22/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 514
BBLS_OIL 347
BTU_GAS 1352
CALC_BBLS_H2O 514
CALC_BBLS_OIL 347
CALC_GOR 1646
CALC_MCF_GAS 571
CASING_PRESS 480
GRAVITY_OIL 46
MCF_GAS 571
TUBING_PRESS 1655
Perforation Data:
Interval Top:7680 ft.# Of Holes:588
Interval Bottom:17681 ft.Hole Size:0.29 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)7276
Total Gas Produced (MCF)85869
GOR11801
GOR DeterminationBOE
Average BOE per Day60.329
Average MCFE per Day349.920

 Federal Financial Assurance  i 

 Tribal Well  i No