|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2025 Measured TD: 18327 ft. Vertical TD: 7261 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/21/2020 | | Proposed Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 1225 FNL 310 FWL | | Bottom Hole Location: | Sec:9 Twp: 3N 68W | Footage: 1233 FNL 370 FWL | | Proposed Depth/Form: | 18234 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1440, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 624, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18234 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2363, Top: , Bottom: 18234 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/25/2020 | | Spud Date: | 2/4/2020 | Spud Date Is: | ACTUAL | | Measured TD: | 18327 ft. | Measured PB depth: | 18311 ft. | | True Vertical TD: | 7261 ft. | True Vertical PB depth: | 7261 ft. | | Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 1225 FNL 310 FWL | | Bottom Hole Location: | Sec:9 Twp: 3N 68W | Footage: 1246 FNL 277 FWL | | Log Types: | Mud log, Composite, MWD/LWD, CBL, (IND/GR in 123-39322) | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18327 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2545, Top: 540 ft., Bottom: 18327 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3703 ft. | 3754 ft. | N | N | | SUSSEX | 4110 ft. | 4258 ft. | N | N | | SHANNON | 4626 ft. | 4656 ft. | N | N | | SHARON SPRINGS | 7019 ft. | | N | N | | NIOBRARA | 7105 ft. | | N | N | | FORT HAYS | 7522 ft. | | N | N | | CODELL | 7596 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 10/2/2024 Interval Top: 10816 ft. Interval Bottom: 17998 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 1/20/2021 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/2/2024 | Treatment End Date: | N/A | | Treatment Summary: | Fort Hays Perf Interval: 10816' - 11071'; 14186' - 14467'; 17634' - 17998' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 10816 ft. | # Of Holes: | 436 | | Interval Bottom: | 17998 ft. | Hole Size: | 0.34 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 7/1/2025 Interval Top: 7778 ft. Interval Bottom: 18080 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 1/20/2021 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/2/2020 | Treatment End Date: | 12/11/2020 | | Treatment Summary: | 11 bbls 15% HCL Acid; 622,085# 100 Mesh Sand; 7,146,715# 20/40 Sand; 156,804 bbls gelled fluid; Flowback determined from well test separator. | | Total fluid used in treatment (bbls): | 156815 | Max pressure during treatment (psi): | 4578 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 30 | | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.95 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 17384 | | Fresh water used in treatment (bbls): | 156804 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 7768800 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7463 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/22/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 578 | | BBLS_OIL | 310 | | BTU_GAS | 1352 | | CALC_BBLS_H2O | 578 | | CALC_BBLS_OIL | 310 | | CALC_GOR | 2171 | | CALC_MCF_GAS | 673 | | CASING_PRESS | 1654 | | GRAVITY_OIL | 46 | | MCF_GAS | 673 | | TUBING_PRESS | 1726 |
| | Perforation Data: | | Interval Top: | 7778 ft. | # Of Holes: | 436 | | Interval Bottom: | 18080 ft. | Hole Size: | 0.34 in. |
|
Formation CODL Formation Classification: OW Status: CM - 10/2/2024 Interval Top: 7778 ft. Interval Bottom: 18080 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/20/2021 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/2/2024 | Treatment End Date: | N/A | | Treatment Summary: | Codell Perf Interval: 7778' - 10815'; 11072' - 14185'; 14468' - 17633'; 17999' - 18080' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7778 ft. | # Of Holes: | 436 | | Interval Bottom: | 18080 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 586 |
| Total Gas Produced (MCF) | 669 |
| GOR | 1141 |
| GOR Determination | BOE |
| Average BOE per Day | 1.903 |
| Average MCFE per Day | 11.043 |
| Federal Financial Assurance | i | |
|
|