Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47382
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:Postle IC #09-142HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:456141LocationID:433857
Municipality/County:MEAD / WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Planned Location:1452FNL  611 FWLLat/Long: 40.243989 / -104.977594Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243989 / -104.977596Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2020
End Date: 12/8/2020
Reported: 12/22/2020
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 18341 ft.    Vertical TD: 7241 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 1875 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 1887 FNL  370 FWL
Proposed Depth/Form:18246 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18246 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2361, Top: , Bottom: 18246 ft.

Wellbore Completed
Completion Date:5/12/2020
Spud Date:2/2/2020Spud Date Is:ACTUAL
Measured TD:18341 ft.Measured PB depth:18324 ft.
True Vertical TD:7241 ft.True Vertical PB depth:7240 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 1875 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 1884 FNL  286 FWL
Log Types:Mud log, Composite, MWD/LWD, CBL, (IND/GR in 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1552 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1552 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18341 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2560, Top: 1634 ft., Bottom: 18341 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3654 ft.3700 ft.NN
SUSSEX4111 ft.4254 ft.NN
SHANNON4625 ft.4656 ft.NN
SHARON SPRINGS7031 ft.NN
NIOBRARA7126 ft.NN
FORT HAYS7586 ft.NN
CODELL7715 ft.NN
CARLILE9856 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/3/2024                 Interval Top: 14481 ft.    Interval Bottom: 18101 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:1/22/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval; 14481' - 14940'; 17918' - 18101'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14481 ft.# Of Holes:414
Interval Bottom:18101 ft.Hole Size:0.34 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/3/2024                 Interval Top: 9856 ft.    Interval Bottom: 15540 ft.

 Completed Information for Formation CARLILE
1st Production Date:1/22/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval; 9856' - 10144'; 10968' - 10981'; 15350' - 15540'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9856 ft.# Of Holes:414
Interval Bottom:15540 ft.Hole Size:0.34 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/1/2025                  Interval Top: 7799 ft.    Interval Bottom: 18101 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:1/22/2021Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/2/2020Treatment End Date:12/8/2020
Treatment Summary:24 bbls 15% HCL Acid; 621,620# 100 Mesh Sand; 7,137,346 # 20/40 Sand; 156,781 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):156805Max pressure during treatment (psi):4409
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:30
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):37901
Fresh water used in treatment (bbls):156781Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7758966Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7204 ft.
Tubing Packer Depth:7186 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/24/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 506
BBLS_OIL 383
BTU_GAS 1352
CALC_BBLS_H2O 506
CALC_BBLS_OIL 383
CALC_GOR 1697
CALC_MCF_GAS 650
CASING_PRESS 1
GRAVITY_OIL 46
MCF_GAS 650
TUBING_PRESS 1616
Perforation Data:
Interval Top:7799 ft.# Of Holes:414
Interval Bottom:18101 ft.Hole Size:0.34 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/3/2024                 Interval Top: 7799 ft.    Interval Bottom: 17917 ft.

 Completed Information for Formation CODELL
1st Production Date:1/22/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/3/2024Treatment End Date:N/A
Treatment Summary:Codell Perf Interval; 7799' - 9855'; 10145' - 10967'; 10982' - 14480'; 14941' - 15349'; 15541' - 17917'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7799 ft.# Of Holes:414
Interval Bottom:17917 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)4150
Total Gas Produced (MCF)72957
GOR17580
GOR DeterminationMCFE
Average BOE per Day45.485
Average MCFE per Day263.808

 Federal Financial Assurance  i 

 Tribal Well  i No