Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47377
Well Classification: OW Status: PR - 2/2/2021
Well Name/No:Postle IC #09-179HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/2/2021
FacilityID:456136LocationID:433857
Municipality/County:MEAD / WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Planned Location:1554FNL  541 FWLLat/Long: 40.243706 / -104.977842Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243706 / -104.977842Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/16/2020
End Date: 11/30/2020
Reported: 12/22/2020
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/2/2021             Measured TD: 18215 ft.    Vertical TD: 6986 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/2/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 2355 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 2370 FNL  370 FWL
Proposed Depth/Form:18029 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18029 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2337, Top: , Bottom: 18029 ft.

Wellbore Completed
Completion Date:4/19/2020
Spud Date:1/29/2020Spud Date Is:ACTUAL
Measured TD:18215 ft.Measured PB depth:18198 ft.
True Vertical TD:6986 ft.True Vertical PB depth:6986 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 2355 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 2370 FNL  275 FWL
Log Types:Mud log, MWD/LWD, CBL, (IND/GR in 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1552 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1552 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18215 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2500, Top: 2254 ft., Bottom: 18215 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3707 ft.3751 ft.NN
SUSSEX4119 ft.4242 ft.NN
SHANNON4625 ft.4658 ft.NN
SHARON SPRINGS7214 ft.NN
NIOBRARA7387 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/2/2021                  Interval Top: 7667 ft.    Interval Bottom: 18020 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/1/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/16/2020Treatment End Date:11/30/2020
Treatment Summary:1488 bbls 15% HCL Acid; 649,559 # 100 Mesh Sand; 7,137,862 # 20/40 Sand; 198,491 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):199979Max pressure during treatment (psi):5315
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:51
Total acid used in treatment (bbls):1488Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):31387
Fresh water used in treatment (bbls):198491Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7787421Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7403 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/2/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 363
BBLS_OIL 567
BTU_GAS 1352
CALC_BBLS_H2O 363
CALC_BBLS_OIL 567
CALC_GOR 1541
CALC_MCF_GAS 874
CASING_PRESS 1514
GRAVITY_OIL 46
MCF_GAS 874
TUBING_PRESS 1521
Perforation Data:
Interval Top:7667 ft.# Of Holes:1060
Interval Bottom:18020 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)5910
Total Gas Produced (MCF)180325
GOR30511
GOR DeterminationMCFE
Average BOE per Day101.624
Average MCFE per Day589.409

 Federal Financial Assurance  i 

 Tribal Well  i No