Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47373
Well Classification: OW Status: PR - 2/3/2021
Well Name/No:Postle IC #09-102HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/3/2021
FacilityID:456132LocationID:433857
Municipality/County:MEAD / WELD #123Location:SWNW 11 3N68W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1453FNL  581 FWLLat/Long: 40.243986 / -104.977703Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.243985 / -104.977702Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/2/2020
End Date: 12/11/2020
Reported: 2/12/2021
Originally Reported: 12/21/2020
Days to report: 63
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/3/2021             Measured TD: 17709 ft.    Vertical TD: 6991 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/3/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:11 Twp: 3N 68W Footage: 1505 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68W Footage: 1515 FNL  370 FWL
Proposed Depth/Form:18240 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1440, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18240 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2375, Top: , Bottom: 18240 ft.

Wellbore Completed
Completion Date:4/29/2020
Spud Date:2/3/2020Spud Date Is:ACTUAL
Measured TD:17709 ft.Measured PB depth:17575 ft.
True Vertical TD:6991 ft.True Vertical PB depth:6991 ft.
Top PZ Location:Sec:11 Twp: 3N 68WFootage: 1505 FNL  310 FWL
Bottom Hole Location:Sec:9 Twp: 3N 68WFootage: 1529 FNL  618 FWL
Log Types:Mud log, MWD/LWD, CBL, (IND/GR in 123-39322)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17586 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2415, Top: 907 ft., Bottom: 17586 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3662 ft.3706 ft.NN
SUSSEX4112 ft.4244 ft.NN
SHANNON4626 ft.4659 ft.NN
SHARON SPRINGS7064 ft.NN
NIOBRARA7240 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/3/2021                  Interval Top: 7541 ft.    Interval Bottom: 17342 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/2/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/2/2020Treatment End Date:12/11/2020
Treatment Summary:821 bbls 15% HCL Acid; 583,022 # 100 Mesh Sand; 6,743,960 # 20/40 Sand; 156,625 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):157446Max pressure during treatment (psi):4770
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:29
Total acid used in treatment (bbls):821Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10234
Fresh water used in treatment (bbls):156625Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7326982Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7215 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/3/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 297
BBLS_OIL 432
BTU_GAS 1352
CALC_BBLS_H2O 297
CALC_BBLS_OIL 432
CALC_GOR 1447
CALC_MCF_GAS 625
CASING_PRESS 6
GRAVITY_OIL 46
MCF_GAS 625
TUBING_PRESS 1528
Perforation Data:
Interval Top:7541 ft.# Of Holes:401
Interval Bottom:17342 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)5505
Total Gas Produced (MCF)92772
GOR16852
GOR DeterminationMCFE
Average BOE per Day59.110
Average MCFE per Day342.839

 Federal Financial Assurance  i 

 Tribal Well  i No