|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 2/5/2020 Measured TD: 14120 ft. Vertical TD: 7193 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 2/5/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 7/21/2020 | Proposed Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 855 FNL 310 FWL | Bottom Hole Location: | Sec:9 Twp: 3N 68W | Footage: 861 FNL 370 FWL | Proposed Depth/Form: | 18184 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1440, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 624, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18184 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2356, Top: , Bottom: 18184 ft. |
| | |
Wellbore Completed | Completion Date: | 2/6/2020 | Spud Date: | 2/5/2020 | Spud Date Is: | ACTUAL | Measured TD: | 14120 ft. | Measured PB depth: | 14118 ft. | True Vertical TD: | 7193 ft. | True Vertical PB depth: | 7193 ft. | Bottom Hole Location: | Sec:9 Twp: 3N 68W | Footage: 383 FNL 865 FEL | Log Types: | Mud Log, MWD/LWD, (IND/GR in 123-39322) | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1553 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1553 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 1553 ft., Depth: 14120 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3689 ft. | 3730 ft. | N | N | SUSSEX | 4111 ft. | 4242 ft. | N | N | SHANNON | 4629 ft. | 4659 ft. | N | N | SHARON SPRINGS | 7079 ft. | | N | N | NIOBRARA | 7192 ft. | | N | N | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 18291 ft. Vertical TD: 7135 ft. Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 3/1/2025 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 4/19/2022 | Proposed Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 855 FNL 310 FWL | Bottom Hole Location: | Sec:9 Twp: 3N 68W | Footage: 861 FNL 370 FWL | Proposed Depth/Form: | 18185 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1440, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1553 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1553 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18185 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2356, Top: , Bottom: 18185 ft. |
| | |
Wellbore Completed | Completion Date: | 4/22/2020 | Spud Date: | 2/5/2020 | Spud Date Is: | ACTUAL | Measured TD: | 18291 ft. | Measured PB depth: | 18274 ft. | True Vertical TD: | 7135 ft. | True Vertical PB depth: | 7135 ft. | Top PZ Location: | Sec:11 Twp: 3N 68W | Footage: 855 FNL 310 FWL | Bottom Hole Location: | Sec:9 Twp: 3N 68W | Footage: 851 FNL 270 FWL | Log Types: | Mud log, MWD/LWD, CBL, (IND/GR in 123-39322) | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1553 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1553 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18291 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2540, Top: 4231 ft., Bottom: 18291 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 13445 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 7841 ft. Interval Bottom: 18095 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/20/2021 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 11/16/2020 | Treatment End Date: | 11/30/2020 | Treatment Summary: | 1488 bbls 15% HCL Acid; 674,673# 100 Mesh Sand; 7,053,890# 20/40 Sand; 188,089 bbls Gelled Fluid; Flowback determined from well test separator | Total fluid used in treatment (bbls): | 189577 | Max pressure during treatment (psi): | 4509 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 50 | Total acid used in treatment (bbls): | 1488 | Min frac gradient (psi/ft): | 0.95 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 32732 | Fresh water used in treatment (bbls): | 188089 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 7728563 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7096 ft. | Tubing Packer Depth: | 7078 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/22/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 519 | BBLS_OIL | 536 | BTU_GAS | 1352 | CALC_BBLS_H2O | 519 | CALC_BBLS_OIL | 536 | CALC_GOR | 746 | CALC_MCF_GAS | 400 | CASING_PRESS | 105 | GRAVITY_OIL | 46 | MCF_GAS | 400 | TUBING_PRESS | 1554 |
| Perforation Data: | Interval Top: | 7841 ft. | # Of Holes: | 1009 | Interval Bottom: | 18095 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5113 |
Total Gas Produced (MCF) | 6858 |
GOR | 1341 |
GOR Determination | BOE |
Average BOE per Day | 16.644 |
Average MCFE per Day | 96.518 |
Federal Financial Assurance | i | |
|
|