Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47266
Well Classification: OW Status: PR - 6/14/2019
Well Name/No:HENDU #23-9HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/14/2019
FacilityID:455790LocationID:305091
County:WELD #123Location:NENE 23 2N66W 6
Field:WATTENBERG - #90750Elevation:5099 ft.
Planned Location:293FNL  494 FELLat/Long: 40.130220 / -104.736646Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.130220 / -104.736649Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/14/2019
End Date: 4/18/2019
Reported: 6/17/2019
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/14/2019             Measured TD: 13029 ft.    Vertical TD: 7260 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/14/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/28/2020
Proposed Top PZ Location:Sec:14 Twp: 2N 66W Footage: 948 FSL  216 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66W Footage: 999 FSL  473 FEL
Proposed Depth/Form:12992 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12982 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1522, Top: , Bottom: 12982 ft.

Wellbore Completed
Completion Date:10/30/2018
Spud Date:9/5/2018Spud Date Is:ACTUAL
Measured TD:13029 ft.Measured PB depth:13011 ft.
True Vertical TD:7260 ft.True Vertical PB depth:7260 ft.
Top PZ Location:Sec:14 Twp: 2N 66WFootage: 938 FSL  265 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66WFootage: 1007 FSL  480 FEL
Log Types:CBL, MWD/LWD. (GR/RES in API 123-47263).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1845 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 718, Top: 0 ft., Bottom: 1845 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13020 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1190, Top: 1388 ft., Bottom: 13029 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1501 ft.
PARKMAN4366 ft.
SUSSEX4752 ft.
SHARON SPRINGS7445 ft.
NIOBRARA7563 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/14/2019                 Interval Top: 7938 ft.    Interval Bottom: 12992 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/3/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/14/2019Treatment End Date:4/18/2019
Treatment Summary:PERF AND FRAC FROM 7938-12992 488 BBL 15% HCL ACID, 71 BBL 7.5% HCL ACID, 4709 BBL PUMP DOWN, 134,751 BBL SLICKWATER, 140,019 TOTAL FLUID, 3,999,280# 40/70 OTTAWA/ST. PETERS, 3,999,280# TOTAL SAND
Total fluid used in treatment (bbls):140019Max pressure during treatment (psi):7984
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):559Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):450Total flowback volume recovered (bbls):7333
Fresh water used in treatment (bbls):139010Disposition method For flowback:RECYCLE
Total proppant used (lbs):3999280Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7561 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/14/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 43
BBLS_OIL 104
BTU_GAS 1281
CALC_BBLS_H2O 43
CALC_BBLS_OIL 104
CALC_GOR 1721
CALC_MCF_GAS 179
CASING_PRESS 2500
GRAVITY_OIL 52
MCF_GAS 179
TUBING_PRESS 1500
Perforation Data:
Interval Top:7938 ft.# Of Holes:876
Interval Bottom:12992 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)4575
Total Gas Produced (MCF)73470
GOR16059
GOR DeterminationMCFE
Average BOE per Day47.122
Average MCFE per Day273.327

 Federal Financial Assurance  i 

 Tribal Well  i No