Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47264
Well Classification: OW Status: PR - 6/18/2019
Well Name/No:HENDU #23-10HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/18/2019
FacilityID:455788LocationID:305091
County:WELD #123Location:NENE 23 2N66W 6
Field:WATTENBERG - #90750Elevation:5099 ft.
Planned Location:293FNL  479 FELLat/Long: 40.130221 / -104.736592Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.130221 / -104.736593Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/14/2019
End Date: 4/16/2019
Reported: 6/6/2019
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/18/2019             Measured TD: 13117 ft.    Vertical TD: 7489 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/18/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/28/2020
Proposed Top PZ Location:Sec:14 Twp: 2N 66W Footage: 650 FSL  209 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66W Footage: 595 FSL  473 FEL
Proposed Depth/Form:13074 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13064 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1532, Top: , Bottom: 13064 ft.

Wellbore Completed
Completion Date:11/2/2018
Spud Date:9/5/2018Spud Date Is:ACTUAL
Measured TD:13117 ft.Measured PB depth:13104 ft.
True Vertical TD:7489 ft.True Vertical PB depth:7489 ft.
Top PZ Location:Sec:14 Twp: 2N 66WFootage: 662 FSL  276 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66WFootage: 595 FSL  486 FEL
Log Types:CBL, MWD/LWD. (GR/RES in API 123-47263).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1847 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 715, Top: 0 ft., Bottom: 1847 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13086 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 2020 ft., Bottom: 13117 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1500 ft.
PARKMAN4319 ft.
SUSSEX4694 ft.
SHARON SPRINGS7353 ft.
NIOBRARA7443 ft.
FORT HAYS7862 ft.
CODELL7922 ft.
CARLILE7995 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/9/2019                  Interval Top: 9258 ft.    Interval Bottom: 9418 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2019Treatment End Date:N/A
Treatment Summary:9258-9418
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9258 ft.# Of Holes:240
Interval Bottom:9418 ft.Hole Size:0.44 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 9/9/2019                  Interval Top: 9012 ft.    Interval Bottom: 9258 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2019Treatment End Date:N/A
Treatment Summary:9012-9258
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9012 ft.# Of Holes:240
Interval Bottom:9258 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/9/2019                  Interval Top: 8241 ft.    Interval Bottom: 12681 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2019Treatment End Date:N/A
Treatment Summary:8241-9012, 9418-12681
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8241 ft.# Of Holes:240
Interval Bottom:12681 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 9/9/2019                  Interval Top: 8019 ft.    Interval Bottom: 8241 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/9/2019Treatment End Date:N/A
Treatment Summary:8019-8241
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8019 ft.# Of Holes:240
Interval Bottom:8241 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 6/18/2019                 Interval Top: 8019 ft.    Interval Bottom: 12681 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:5/3/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/14/2019Treatment End Date:4/16/2019
Treatment Summary:PERF AND FRAC FROM 8019-12681. 21 BBL 15% HCL ACID, 24 BBL 7.5% HCL ACID, 1,756 BBL PUMP DOWN, 52,361 BBL SLICKWATER, 54,162 TOTAL FLUID, 1,572,820# 40/70 OTTAWA/ST. PETERS, 1,572,820# TOTAL SAND.
Total fluid used in treatment (bbls):54162Max pressure during treatment (psi):7189
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):45Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7995
Fresh water used in treatment (bbls):54117Disposition method For flowback:DISPOSAL
Total proppant used (lbs):1572820Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7653 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/18/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 43
BBLS_OIL 104
BTU_GAS 1266
CALC_BBLS_H2O 43
CALC_BBLS_OIL 104
CALC_GOR 1721
CALC_MCF_GAS 179
CASING_PRESS 2500
GRAVITY_OIL 48
MCF_GAS 179
TUBING_PRESS 1500
Perforation Data:
Interval Top:8019 ft.# Of Holes:240
Interval Bottom:12681 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)1823
Total Gas Produced (MCF)36419
GOR19977
GOR DeterminationMCFE
Average BOE per Day22.169
Average MCFE per Day128.595

 Federal Financial Assurance  i 

 Tribal Well  i No