Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47262
Well Classification: OW Status: PR - 4/1/2022
Well Name/No:HENDU #23-1HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2022
FacilityID:455786LocationID:305091
County:WELD #123Location:NENE 23 2N66W 6
Field:WATTENBERG - #90750Elevation:5100 ft.
Planned Location:293FNL  614 FELLat/Long: 40.130217 / -104.737075Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.130218 / -104.737074Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/2/2019
End Date: 4/7/2019
Reported: 6/4/2019
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2022             Measured TD: 14005 ft.    Vertical TD: 7488 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/28/2020
Proposed Top PZ Location:Sec:14 Twp: 2N 66W Footage: 2336 FNL  267 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66W Footage: 2345 FNL  483 FEL
Proposed Depth/Form:13950 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13940 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1639, Top: , Bottom: 13940 ft.

Wellbore Completed
Completion Date:10/3/2018
Spud Date:9/5/2018Spud Date Is:ACTUAL
Measured TD:14005 ft.Measured PB depth:13987 ft.
True Vertical TD:7488 ft.True Vertical PB depth:7488 ft.
Top PZ Location:Sec:14 Twp: 2N 66WFootage: 2341 FNL  334 FEL
Bottom Hole Location:Sec:13 Twp: 2N 66WFootage: 2329 FNL  489 FEL
Log Types:CBL, MWD/LWD. (GR/RES in API 123-47263).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1919 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 746, Top: 0 ft., Bottom: 1919 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13996 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1300, Top: 1496 ft., Bottom: 14005 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1512 ft.
PARKMAN4850 ft.
SUSSEX5323 ft.
SHARON SPRINGS8163 ft.
NIOBRARA8251 ft.
FORT HAYS8730 ft.
CODELL8844 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/13/2019                 Interval Top: 10537 ft.    Interval Bottom: 13662 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2019Treatment End Date:N/A
Treatment Summary:FORT HAYS: 10537-10645, 13500-13662.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10537 ft.# Of Holes:354
Interval Bottom:13662 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 4/1/2022                  Interval Top: 8869 ft.    Interval Bottom: 13959 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:5/3/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/2/2019Treatment End Date:4/7/2019
Treatment Summary:PERF AND FRAC FROM 8869-13959. 120 BBL 15% HCL ACID; 2,901 BBL PUMP DOWN; 93,147 BBL SLICKWATER; 96,168 TOTAL FLUID; 2,823,190# 40/70 PREMIUM; 2,823,190# TOTAL SAND.
Total fluid used in treatment (bbls):96168Max pressure during treatment (psi):7369
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):120Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):1050Total flowback volume recovered (bbls):8649
Fresh water used in treatment (bbls):94998Disposition method For flowback:RECYCLE
Total proppant used (lbs):2823190Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8521 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/7/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 174
BTU_GAS 1266
CALC_BBLS_OIL 174
CALC_GOR 609
CALC_MCF_GAS 106
CASING_PRESS 2000
GRAVITY_OIL 48
MCF_GAS 106
TUBING_PRESS 1000
Perforation Data:
Interval Top:8869 ft.# Of Holes:354
Interval Bottom:13959 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/13/2019                 Interval Top: 8869 ft.    Interval Bottom: 13949 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/13/2019Treatment End Date:N/A
Treatment Summary:CODELL: 8869-10537, 10645-13500, 13662-13949.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8869 ft.# Of Holes:354
Interval Bottom:13949 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)4422
Total Gas Produced (MCF)34104
GOR7712
GOR DeterminationBOE
Average BOE per Day28.196
Average MCFE per Day163.538

 Federal Financial Assurance  i 

 Tribal Well  i No