Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47173
Well Classification: OW Status: PR - 10/1/2018
Well Name/No:Rinn Valley East #17N-20-13C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2018
FacilityID:455609LocationID:455340
County:WELD #123Location:SESE 18 2N68W 6
Field:WATTENBERG - #90750Elevation:4938 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:200FSL  533 FELLat/Long: 40.132044 / -105.038574Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.132044 / -105.038575Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/11/2018
End Date: 10/21/2018
Reported: 10/26/2018
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2018             Measured TD: 17796 ft.    Vertical TD: 7418 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/22/2020
Proposed Top PZ Location:Sec:17 Twp: 2N 68W Footage: 505 FSL  1419 FWL
Bottom Hole Location:Sec:8 Twp: 2N 68W Footage: 512 FNL  1422 FWL
Proposed Depth/Form:17873 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1968 , Unit Acreage: 1280, Drill Unit: S8:All & S17:All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17873 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2386, Top: , Bottom: 17873 ft.

Wellbore Completed
Completion Date:7/23/2018
Spud Date:7/5/2018Spud Date Is:ACTUAL
Measured TD:17796 ft.Measured PB depth:17781 ft.
True Vertical TD:7418 ft.True Vertical PB depth:7418 ft.
Top PZ Location:Sec:17 Twp: 2N 68WFootage: 505 FSL  1419 FWL
Bottom Hole Location:Sec:8 Twp: 2N 68WFootage: 512 FNL  1422 FWL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-47175).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1617 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1617 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17781 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2830, Top: 350 ft., Bottom: 17781 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3964 ft.NN
SUSSEX4462 ft.NN
SHANNON5052 ft.NN
SHARON SPRINGS7527 ft.NN
NIOBRARA7650 ft.NN
FORT HAYS8173 ft.NN
CODELL8399 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 3/8/2019                  Interval Top: 8401 ft.    Interval Bottom: 17731 ft.

 Completed Information for Formation CODELL
1st Production Date:12/28/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2018Treatment End Date:10/21/2018
Treatment Summary:Perforated Interval: 8401'-17731'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8401 ft.# Of Holes:1105
Interval Bottom:17731 ft.Hole Size:0.38 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 1/15/2019                 Interval Top: 8198 ft.    Interval Bottom: 17731 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:12/28/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2018Treatment End Date:10/21/2018
Treatment Summary:Frac'd Codell-Fort Hays with 48-stage plug-and-perf; 17484 total bbls fluid pumped: 17478 bbls fresh water and 6 bbls 28% HCl acid; 9600230 total lbs proppant pumped: 9550090 lbs 30/50 mesh and 50140 lbs 40/70 mesh.
Total fluid used in treatment (bbls):17484Max pressure during treatment (psi):8873
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13007
Fresh water used in treatment (bbls):17478Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9600230Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8080 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/15/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 326
BBLS_OIL 307
BTU_GAS 1366
CALC_BBLS_H2O 326
CALC_BBLS_OIL 307
CALC_GOR 3863
CALC_MCF_GAS 1186
CASING_PRESS 2767
GRAVITY_OIL 48
MCF_GAS 1186
TUBING_PRESS 1776
Perforation Data:
Interval Top:8198 ft.# Of Holes:1129
Interval Bottom:17731 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 3/8/2019                  Interval Top: 8198 ft.    Interval Bottom: 8367 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:12/28/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/11/2018Treatment End Date:10/21/2018
Treatment Summary:Perforated Interval: 8198'-8367'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8198 ft.# Of Holes:24
Interval Bottom:8367 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)5063
Total Gas Produced (MCF)59908
GOR11832
GOR DeterminationBOE
Average BOE per Day42.246
Average MCFE per Day245.031

 Federal Financial Assurance  i 

 Tribal Well  i No