Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47061
Well Classification: OW Status: PR - 3/12/2021
Well Name/No:East Ault #14-18-19HNB
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BAYSWATER EXPLORATION & PRODUCTION LLC - 10261
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/12/2021
FacilityID:455454LocationID:455456
County:WELD #123Location:NWNE 18 7N65W 6
Field:WATTENBERG - #90750Elevation:4908 ft.
Planned Location:299FNL  2172 FELLat/Long: 40.581669 / -104.704231Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.581670 / -104.704229Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/4/2020
End Date: 11/27/2020
Reported: 7/13/2021
Originally Reported: 12/10/2020
Days to report: 228
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/12/2021             Measured TD: 17428 ft.    Vertical TD: 7192 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/12/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/16/2020
Prop Depth/Form:17375 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2402 , Unit Acreage: 640, Drill Unit: 18 & 19: E/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17445 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2384, Top: 2500 ft., Bottom: 17445 ft.

Wellbore Completed
Completion Date:8/2/2020
Spud Date:4/26/2020Spud Date Is:ACTUAL
Measured TD:17428 ft.Measured PB depth:17394 ft.
True Vertical TD:7192 ft.True Vertical PB depth:7192 ft.
Top PZ Location:Sec:18 Twp: 7N 65WFootage: 683 FNL  820 FELDepth
Bottom Hole Location:Sec:19 Twp: 7N 65WFootage: 471 FSL  816 FELDepth
Log Types:CBL, MUD LOG, MWD/LWD, (CNL in API 123-47066)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1554 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 1554 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17419 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2690, Top: 70 ft., Bottom: 17419 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4030 ft.NN
SUSSEX4599 ft.NN
SHANNON5118 ft.NN
SHARON SPRINGS7305 ft.NN
NIOBRARA7330 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/12/2021                 Interval Top: 7996 ft.    Interval Bottom: 17327 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/12/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/4/2020Treatment End Date:11/26/2020
Treatment Summary:547871 bbls total; 17417686 # sand total(1786412 100/mesh 1928922 40/70 13702352 30/50); 20492 gals HCL, 574383 bbls Slickwater
Total fluid used in treatment (bbls):547871Max pressure during treatment (psi):9039
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:52
Total acid used in treatment (bbls):488Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10195
Fresh water used in treatment (bbls):547383Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17417686Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/12/2021Test Method:Producing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 712
BBLS_OIL 38
BTU_GAS 1360
CALC_BBLS_H2O 172
CALC_BBLS_OIL 38
CALC_GOR 1157
CALC_MCF_GAS 44
CASING_PRESS 1976
GRAVITY_OIL 40
MCF_GAS 44
Perforation Data:
Interval Top:7996 ft.# Of Holes:1664
Interval Bottom:17327 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)26920
Total Gas Produced (MCF)194601
GOR7228
GOR DeterminationBOE
Average BOE per Day165.078
Average MCFE per Day957.465

 Federal Financial Assurance  i 

 Tribal Well  i No