Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47011
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:North Platte #F21-J24-28HNB
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:455361LocationID:455363
County:WELD #123Location:NESW 21 5N63W 6
Field:WATTENBERG - #90750Elevation:4553 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1427FSL  1444 FWLLat/Long: 40.381654 / -104.445324Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.381653 / -104.445323Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/5/2018
End Date: 12/11/2018
Reported: 1/24/2019
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 11537 ft.    Vertical TD: 6330 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/8/2020
Proposed Top PZ Location:Sec:21 Twp: 5N 63W Footage: 4 FSL  1664 FWL
Bottom Hole Location:Sec:28 Twp: 5N 63W Footage: 493 FSL  1642 FWL
Proposed Depth/Form:11523 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 743, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11523 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1806, Top: 0 ft., Bottom: 11523 ft.

Wellbore Completed
Completion Date:9/19/2018
Spud Date:9/7/2018Spud Date Is:ACTUAL
Measured TD:11537 ft.Measured PB depth:11485 ft.
True Vertical TD:6330 ft.True Vertical PB depth:6330 ft.
Top PZ Location:Sec:21 Twp: 5N 63WFootage: 4 FSL  1664 FWL
Bottom Hole Location:Sec:28 Twp: 5N 63WFootage: 493 FSL  1642 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 123-47012).
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1602 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 766, Top: 0 ft., Bottom: 1612 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 11527 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1747, Top: 4690 ft., Bottom: 11537 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3416 ft.
SHARON SPRINGS6299 ft.
NIOBRARA6678 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2025                  Interval Top: 6748 ft.    Interval Bottom: 11393 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/20/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/5/2018Treatment End Date:12/11/2019
Treatment Summary:37-stage plug-and-perf completion; 195799 total bbls fluid pumped: 195359 bbls fresh water (slurry) and 440 bbls 15% HCl acid; 9563600 total bbls fluid pumped: 9183240 lbs 30/50 Ottawa Sand and 380360 lbs 100 mesh.
Total fluid used in treatment (bbls):195799Max pressure during treatment (psi):6916
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):440Min frac gradient (psi/ft):1.05
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7924
Fresh water used in treatment (bbls):195359Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9563600Green completions techniques utilized:Yes
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:6280 ft.
Tubing Packer Depth:6280 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/28/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 935
BBLS_OIL 509
BTU_GAS 1
CALC_BBLS_H2O 935
CALC_BBLS_OIL 509
CALC_GOR 1637
CALC_MCF_GAS 833
CASING_PRESS 1264
GRAVITY_OIL 44
MCF_GAS 833
TUBING_PRESS 543
Perforation Data:
Interval Top:6748 ft.# Of Holes:888
Interval Bottom:11393 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4168
Total Gas Produced (MCF)124732
GOR29926
GOR DeterminationMCFE
Average BOE per Day69.942
Average MCFE per Day405.657

 Federal Financial Assurance  i 

 Tribal Well  i No