Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46995
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:Sack KE #21-319HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:455342LocationID:446474
County:WELD #123Location:SWSW 21 1N66W 6
Field:WATTENBERG - #90750Elevation:5018 ft.
Planned Location:757FSL  359 FWLLat/Long: 40.031512 / -104.790185Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.031512 / -104.790183Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/19/2018
End Date: 8/29/2018
Reported: 9/13/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2018             Measured TD: 12322 ft.    Vertical TD: 7639 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/8/2020
Proposed Top PZ Location:Sec:21 Twp: 1N 66W Footage: 1316 FSL  386 FEL
Bottom Hole Location:Sec:21 Twp: 1N 66W Footage: 1316 FSL  386 FEL
Proposed Depth/Form:12068 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1709 , Unit Acreage: 320, Drill Unit: Sec. 21: S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12440 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1062, Top: 4700 ft., Bottom: 12440 ft.

Wellbore Completed
Completion Date:7/3/2018
Spud Date:7/3/2018Spud Date Is:ACTUAL
Measured TD:12322 ft.Measured PB depth:12322 ft.
True Vertical TD:7639 ft.True Vertical PB depth:7639 ft.
Top PZ Location:Sec:21 Twp: 1N 66WFootage: 1316 FSL  386 FEL
Bottom Hole Location:Sec:21 Twp: 1N 66WFootage: 1316 S  386 E
Log Types:Mud Log, MWD/LWD, (Composite in API# 123-46994)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1524 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 672, Top: 0 ft., Bottom: 1524 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 1524 ft., Depth: 12322 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN4403 ft.4588 ft.NN
SUSSEX4769 ft.4931 ft.NN
SHANNON5727 ft.5856 ft.NN
SHARON SPRINGS7185 ft.NN
NIOBRARA7319 ft.NN
FORT HAYS7867 ft.NN
CODELL7975 ft.NN
CARLILE10632 ft.NN
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 12322 ft.    Vertical TD: 7611 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/21/2020
Proposed Top PZ Location:Sec:21 Twp: 1N 66W Footage: 1315 FSL  460 FWL
Bottom Hole Location:Sec:21 Twp: 1N 66W Footage: 1265 FSL  370 FEL
Proposed Depth/Form:12344 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1709 , Unit Acreage: 320, Drill Unit: SEC. 21: S2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1524 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1524 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12344 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1048, Top: 0 ft., Bottom: 12344 ft.

Wellbore Completed
Completion Date:7/21/2018
Spud Date:7/3/2018Spud Date Is:ACTUAL
Measured TD:12322 ft.Measured PB depth:12313 ft.
True Vertical TD:7611 ft.True Vertical PB depth:7611 ft.
Top PZ Location:Sec:21 Twp: 1N 66WFootage: 1337 FSL  590 FWL
Bottom Hole Location:Sec:21 Twp: 1N 66WFootage: 1268 S  386 E
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API# 123-46994)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1524 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 672, Top: 0 ft., Bottom: 1524 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12322 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1189, Top: 3814 ft., Bottom: 12322 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4403 ft.4588 ft.NN
SUSSEX4769 ft.4931 ft.
SHANNON5727 ft.5856 ft.
SHARON SPRINGS7185 ft.
NIOBRARA7319 ft.
FORT HAYS7867 ft.
CODELL7975 ft.
CARLILE10634 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 12/6/2019                 Interval Top: 10634 ft.    Interval Bottom: 10862 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/20/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2019Treatment End Date:N/A
Treatment Summary:Carlile perforated interval(s): 10634'-10862'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10634 ft.# Of Holes:630
Interval Bottom:10862 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 12/6/2019                 Interval Top: 9804 ft.    Interval Bottom: 11576 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/20/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2019Treatment End Date:N/A
Treatment Summary:Fort Hays perforated interval(s): 9804'-9922', 10001'-10633', 11294'-11576'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9804 ft.# Of Holes:630
Interval Bottom:11576 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/1/2024                  Interval Top: 8051 ft.    Interval Bottom: 12195 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/20/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/19/2018Treatment End Date:8/29/2018
Treatment Summary:219,030# 100 Mesh Sand; 3,980,831# 20/40 Sand; 68,324 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):68324Max pressure during treatment (psi):4588
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7934
Fresh water used in treatment (bbls):68324Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4199861Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7770 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/28/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 357
BBLS_OIL 391
BTU_GAS 1362
CALC_BBLS_H2O 357
CALC_BBLS_OIL 391
CALC_GOR 1324
CALC_MCF_GAS 518
CASING_PRESS 2100
GRAVITY_OIL 44
MCF_GAS 518
TUBING_PRESS 1000
Perforation Data:
Interval Top:8051 ft.# Of Holes:630
Interval Bottom:12195 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/6/2019                 Interval Top: 8051 ft.    Interval Bottom: 12195 ft.

 Completed Information for Formation CODELL
1st Production Date:9/20/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:12/6/2019Treatment End Date:N/A
Treatment Summary:Codell perforated interval(s): 8051'-9803', 9923'-10000', 10863'-11293', 11577' - 12195'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8051 ft.# Of Holes:630
Interval Bottom:12195 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)75
Total Gas Produced (MCF)4193
GOR55906
GOR DeterminationMCFE
Average BOE per Day2.190
Average MCFE per Day12.699

 Federal Financial Assurance  i 

 Tribal Well  i No