Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46831
Well Classification: OW Status: PR - 5/2/2024
Well Name/No:Boyd 2413 #11H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/2/2024
FacilityID:454991LocationID:454529
County:WELD #123Location:NESW 24 2N64W 6
Field:WATTENBERG - #90750Elevation:4923 ft.
Planned Location:1441FSL  2387 FWLLat/Long: 40.120601 / -104.500598Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/20/2024
End Date: 3/27/2024
Reported: 4/16/2024
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/2/2024             Measured TD: 17572 ft.    Vertical TD: 6727 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/2/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/10/2025
Proposed Top PZ Location:Sec:24 Twp: 2N 64W Footage: 460 FSL  480 FEL
Bottom Hole Location:Sec:13 Twp: 2N 64W Footage: 370 FNL  480 FEL
Proposed Depth/Form:17620 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-1192 , Unit Acreage: 1280, Drill Unit: 2N,64W Section 24 &
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 92, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2040 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 554, Top: 0 ft., Bottom: 2040 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17620 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2205, Top: , Bottom: 17620 ft.

Wellbore Completed
Completion Date:1/12/2024
Spud Date:5/24/2022Spud Date Is:ACTUAL
Measured TD:17572 ft.Measured PB depth:17489 ft.
True Vertical TD:6727 ft.True Vertical PB depth:6726 ft.
Top PZ Location:Sec:24 Twp: 2N 64WFootage: 490 FSL  543 FEL
Bottom Hole Location:Sec:13 Twp: 2N 64WFootage: 339 N  478 E
Log Types:
Log Types:MWD/LWD (CBL, RES in API 05-123-46833)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2298 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1193, Top: 0 ft., Bottom: 2298 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17572 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2450, Top: 1060 ft., Bottom: 17572 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS0 ft.927 ft.
PARKMAN4268 ft.
SUSSEX4502 ft.
SHANNON5541 ft.
SHARON SPRINGS7347 ft.
NIOBRARA7403 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/2/2024                  Interval Top: 7805 ft.    Interval Bottom: 17397 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/2/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/20/2024Treatment End Date:3/27/2024
Treatment Summary:FR Water 473,069 bbl, Treated Water 22,281bbl, Fresh Water 2405 bbl, Recycled Water 4434 bbl (21,091,925 gals), 28% HCL 881 bbl. Proppant:100 Mesh 3,359,706 lbs, 40/70 white sand: 16,656,440 lbs. Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges during permanent facility flowback.
Total fluid used in treatment (bbls):503070Max pressure during treatment (psi):11141
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):881Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):4434Total flowback volume recovered (bbls):5292
Fresh water used in treatment (bbls):497755Disposition method For flowback:DISPOSAL
Total proppant used (lbs):20016146Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/2/2024Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 670
BBLS_OIL 112
BTU_GAS 1583
CALC_BBLS_H2O 670
CALC_BBLS_OIL 112
CALC_GOR 348
CALC_MCF_GAS 39
CASING_PRESS 1408
GRAVITY_OIL 39
MCF_GAS 39
Perforation Data:
Interval Top:7805 ft.# Of Holes:1518
Interval Bottom:17397 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)55821
Total Gas Produced (MCF)68029
GOR1218
GOR DeterminationBOE
Average BOE per Day184.246
Average MCFE per Day1068.613

 Federal Financial Assurance  i 

 Tribal Well  i No