|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/9/2024 Measured TD: 16795 ft. Vertical TD: 6463 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/9/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/24/2022 | | Proposed Top PZ Location: | Sec:19 Twp: 8N 60W | Footage: 379 FNL 439 FEL | | Bottom Hole Location: | Sec:24 Twp: 8N 61W | Footage: 365 FNL 301 FWL | | Proposed Depth/Form: | 16992 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1298 , Unit Acreage: 1280, Drill Unit: 19,24: All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 43 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 0 ft., Bottom: 1850 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16992 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1860, Top: , Bottom: 16992 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/15/2023 | | Spud Date: | 7/29/2023 | Spud Date Is: | ACTUAL | | Measured TD: | 16795 ft. | Measured PB depth: | 16773 ft. | | True Vertical TD: | 6463 ft. | True Vertical PB depth: | 6463 ft. | | Top PZ Location: | Sec:19 Twp: 8N 60W | Footage: 379 FNL 439 FEL | | Bottom Hole Location: | Sec:24 Twp: 8N 61W | Footage: 365 FNL 301 FWL | | Log Types: | NO LOGS UPLOAD | | Log Types: | CBL, MWD/LWD, (Resistivity 123-46706) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 94 ft., Weight: 43 , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 94 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1932 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 0 ft., Bottom: 1932 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16773 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2690, Top: 2750 ft., Bottom: 16773 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 2301 ft. | | N | N | | SUSSEX | 3510 ft. | | N | N | | SHANNON | 5109 ft. | | N | N | | SHARON SPRINGS | 6517 ft. | | N | N | | NIOBRARA | 6605 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 7/9/2024 Interval Top: 6948 ft. Interval Bottom: 16712 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/11/2024 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 3/19/2024 | Treatment End Date: | 4/1/2024 | | Treatment Summary: | Frac'd Niobrara with 53 stage plug and perf:
16734751 total lbs proppant pumped: 15476771 lbs 40/70 mesh and 1257980 lbs 100 mesh;
582981 total bbls fluid pumped: 563801 bbls gelled fluid, 18552 bbls fresh water and 628 bbls 15% HCl acid. | | Total fluid used in treatment (bbls): | 582981 | Max pressure during treatment (psi): | 9472 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 53 | | Total acid used in treatment (bbls): | 628 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 18552 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 16734751 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6683 ft. | | Tubing Packer Depth: | 6681 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/9/2024 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1190 | | BBLS_OIL | 364 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 1190 | | CALC_BBLS_OIL | 364 | | CALC_GOR | 780 | | CALC_MCF_GAS | 284 | | CASING_PRESS | 214 | | GRAVITY_OIL | 35 | | MCF_GAS | 284 | | TUBING_PRESS | 602 |
| | Perforation Data: | | Interval Top: | 6948 ft. | # Of Holes: | 3348 | | Interval Bottom: | 16712 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 123717 |
| Total Gas Produced (MCF) | 377527 |
| GOR | 3051 |
| GOR Determination | BOE |
| Average BOE per Day | 517.629 |
| Average MCFE per Day | 3002.248 |
| Federal Financial Assurance | i | |
|
|