|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/25/2024 Measured TD: 16721 ft. Vertical TD: 6426 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/25/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/24/2022 | | Proposed Top PZ Location: | Sec:19 Twp: 8N 60W | Footage: 2515 FNL 300 FEL | | Bottom Hole Location: | Sec:24 Twp: 8N 61W | Footage: 2515 FNL 300 FWL | | Proposed Depth/Form: | 16781 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-1298 , Unit Acreage: 1280, Drill Unit: 19,24: All | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 43 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 650, Top: 0 ft., Bottom: 1850 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16781 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1860, Top: , Bottom: 16781 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/4/2023 | | Spud Date: | 8/1/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 16721 ft. | Measured PB depth: | 16707 ft. | | True Vertical TD: | 6426 ft. | True Vertical PB depth: | 6426 ft. | | Top PZ Location: | Sec:19 Twp: 8N 60W | Footage: 2528 FNL 320 FEL | | Bottom Hole Location: | Sec:24 Twp: 8N 61W | Footage: 2503 FNL 302 FWL | | Log Types: | NO LOGS TO UPLOAD | | Log Types: | CBL, MWD/LWD, (Resistivity 123-46706) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 94 ft., Weight: 43 , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 94 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1957 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 830, Top: 0 ft., Bottom: 1957 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16707 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2675, Top: 1120 ft., Bottom: 16707 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 2279 ft. | | N | N | | SUSSEX | 3501 ft. | | N | N | | SHANNON | 5084 ft. | | N | N | | SHARON SPRINGS | 6334 ft. | | N | N | | NIOBRARA | 6410 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 6/25/2024 Interval Top: 6761 ft. Interval Bottom: 16654 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/11/2024 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 4/3/2024 | Treatment End Date: | 4/17/2024 | | Treatment Summary: | Frac'd Niobrara with 52 stage plug and perf:
16983480 total lbs proppant pumped: 9740045 lbs 40/70 mesh and 7243435 lbs 100 mesh;
588955 total bbls fluid pumped: 571170 bbls gelled fluid, 17130 bbls fresh water and 655 bbls 15% HCl Acid. | | Total fluid used in treatment (bbls): | 588955 | Max pressure during treatment (psi): | 8979 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 52 | | Total acid used in treatment (bbls): | 655 | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 17130 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 16983480 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6499 ft. | | Tubing Packer Depth: | 6498 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/25/2024 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1347 | | BBLS_OIL | 230 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 1347 | | CALC_BBLS_OIL | 230 | | CALC_GOR | 813 | | CALC_MCF_GAS | 187 | | CASING_PRESS | 6 | | GRAVITY_OIL | 35 | | MCF_GAS | 187 | | TUBING_PRESS | 803 |
| | Perforation Data: | | Interval Top: | 6761 ft. | # Of Holes: | 3259 | | Interval Bottom: | 16654 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 105679 |
| Total Gas Produced (MCF) | 300956 |
| GOR | 2847 |
| GOR Determination | BOE |
| Average BOE per Day | 431.981 |
| Average MCFE per Day | 2505.477 |
| Federal Financial Assurance | i | |
|
|