Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46566
Well Classification: OW Status: PR - 3/1/2022
Well Name/No:Ruegge #3G-4H-N165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:454447LocationID:331527
County:WELD #123Location:SESW 4 1N65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4916 ft.
Planned Location:700FSL  2097 FWLLat/Long: 40.075241 / -104.670915Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075219 / -104.670911Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/27/2018
End Date: 9/4/2018
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 276
Days to report: 197
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2022             Measured TD: 12070 ft.    Vertical TD: 7114 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/20/2020
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 460 FSL  1194 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 465 FNL  1156 FWL
Proposed Depth/Form:12031 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2290  , Unit Acreage: 640, Drill Unit: Sec 4: All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2430 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 934, Top: 0 ft., Bottom: 2430 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12031 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1630, Top: , Bottom: 12031 ft.

Wellbore Completed
Completion Date:6/14/2018
Spud Date:5/2/2018Spud Date Is:ACTUAL
Measured TD:12070 ft.Measured PB depth:12042 ft.
True Vertical TD:7114 ft.True Vertical PB depth:7113 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 460 FSL  1194 FWL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 465 N  1156 W
Log Types:MUD, MWD/LWD, CBL (DIL in 123-20848)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2442 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 882, Top: 0 ft., Bottom: 2460 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12031 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1578, Top: 2594 ft., Bottom: 12070 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4504 ft.NN
SHANNON5278 ft.NN
TEEPEE BUTTES6428 ft.NN
SHARON SPRINGS7067 ft.NN
NIOBRARA7096 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/1/2022                  Interval Top: 7720 ft.    Interval Bottom: 12029 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/9/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/27/2018Treatment End Date:9/4/2018
Treatment Summary:175328 bbls of water, 125 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 51 bbl HCL in a 43 stage frac with 3903300 lbs of silica quartz proppant
Total fluid used in treatment (bbls):175504Max pressure during treatment (psi):8720
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):51Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10578
Fresh water used in treatment (bbls):175453Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3903300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7289 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/27/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 550
BBLS_OIL 472
BTU_GAS 1317
CALC_BBLS_H2O 550
CALC_BBLS_OIL 472
CALC_GOR 1252
CALC_MCF_GAS 591
CASING_PRESS 1800
GRAVITY_OIL 43
MCF_GAS 591
TUBING_PRESS 950
Perforation Data:
Interval Top:7720 ft.# Of Holes:987
Interval Bottom:12029 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2281
Total Gas Produced (MCF)29670
GOR13007
GOR DeterminationBOE
Average BOE per Day20.188
Average MCFE per Day117.111

 Federal Financial Assurance  i 

 Tribal Well  i No