|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/1/2018 Measured TD: 12064 ft. Vertical TD: 7290 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/1/2018 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/20/2020 | | Proposed Top PZ Location: | Sec:4 Twp: 1N 65W | Footage: 460 FSL 2293 FWL | | Bottom Hole Location: | Sec:4 Twp: 1N 65W | Footage: 464 FNL 2305 FWL | | Proposed Depth/Form: | 12188 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CD-FH , Formation: CODELL-FORT HAYS , Order: 407-2290 , Unit Acreage: 640, Drill Unit: Sec 4: All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 78, Top: 0 ft., Bottom: 98 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2424 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 932, Top: 0 ft., Bottom: 2424 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12188 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 1654, Top: , Bottom: 12188 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/28/2018 | | Spud Date: | 5/7/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 12064 ft. | Measured PB depth: | 12026 ft. | | True Vertical TD: | 7290 ft. | True Vertical PB depth: | 7290 ft. | | Top PZ Location: | Sec:4 Twp: 1N 65W | Footage: 460 FSL 2293 FWL | | Bottom Hole Location: | Sec:4 Twp: 1N 65W | Footage: 464 FNL 2305 FWL | | Log Types: | MUD, MWD/LWD, CBL (DIL in 123-20848) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL | | Cement: | Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2431 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 900, Top: 0 ft., Bottom: 2466 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12051 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1598, Top: 2357 ft., Bottom: 12064 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4476 ft. | | N | N | | SHANNON | 5235 ft. | | N | N | | TEEPEE BUTTES | 6327 ft. | | N | N | | SHARON SPRINGS | 6997 ft. | | N | N | | NIOBRARA | 7026 ft. | | N | N | | FORT HAYS | 7540 ft. | | N | N | | CODELL | 7586 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 6/23/2020 Interval Top: 8696 ft. Interval Bottom: 9256 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/23/2020 | Treatment End Date: | N/A | | Treatment Summary: | 8696'-9256' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8696 ft. | # Of Holes: | 343 | | Interval Bottom: | 9256 ft. | Hole Size: | 0.42 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 10/27/2018 Interval Top: 7698 ft. Interval Bottom: 12025 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 11/9/2018 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/27/2018 | Treatment End Date: | 9/1/2018 | | Treatment Summary: | 99868 bbls of water, 64 bbls of additives (FRP-4CS, ACI-97, ASF-67) and 6 bbl HCL in a 16 stage frac with 2619030 lbs of silica quartz proppant
| | Total fluid used in treatment (bbls): | 99938 | Max pressure during treatment (psi): | 8540 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 16 | | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.88 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 7857 | | Fresh water used in treatment (bbls): | 99932 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 2619030 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7354 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/27/2018 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 452 | | BBLS_OIL | 346 | | BTU_GAS | 1350 | | CALC_BBLS_H2O | 452 | | CALC_BBLS_OIL | 346 | | CALC_GOR | 1347 | | CALC_MCF_GAS | 466 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 43 | | MCF_GAS | 466 | | TUBING_PRESS | 800 |
| | Perforation Data: | | Interval Top: | 7698 ft. | # Of Holes: | 343 | | Interval Bottom: | 12025 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 6/23/2020 Interval Top: 7698 ft. Interval Bottom: 12025 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/23/2020 | Treatment End Date: | N/A | | Treatment Summary: | 7698'-8695', 9257'-12025' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7698 ft. | # Of Holes: | 343 | | Interval Bottom: | 12025 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 2235 |
| Total Gas Produced (MCF) | 44216 |
| GOR | 19783 |
| GOR Determination | MCFE |
| Average BOE per Day | 26.989 |
| Average MCFE per Day | 156.544 |
| Federal Financial Assurance | i | |
|
|