|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2022 Measured TD: 12300 ft. Vertical TD: 7087 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/20/2020 | Proposed Top PZ Location: | Sec:4 Twp: 1N 65W | Footage: 457 FSL 756 FEL | Bottom Hole Location: | Sec:4 Twp: 1N 65W | Footage: 461 FNL 791 FEL | Proposed Depth/Form: | 12408 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2290 , Unit Acreage: 640, Drill Unit: Sec 4: All | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED | Cement: | Sacks: 78, Top: 0 ft., Bottom: 98 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2520 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 966, Top: 0 ft., Bottom: 2520 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12408 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1687, Top: , Bottom: 12408 ft. |
| | |
Wellbore Completed | Completion Date: | 7/22/2018 | Spud Date: | 5/15/2018 | Spud Date Is: | ACTUAL | Measured TD: | 12300 ft. | Measured PB depth: | 12270 ft. | True Vertical TD: | 7087 ft. | True Vertical PB depth: | 7087 ft. | Top PZ Location: | Sec:4 Twp: 1N 65W | Footage: 457 FSL 756 FEL | Bottom Hole Location: | Sec:4 Twp: 1N 65W | Footage: 461 N 791 E | Log Types: | MUD, MWD/LWD, CBL (DIL in 123-20848) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2533 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 971, Top: 0 ft., Bottom: 2540 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12282 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1647, Top: 2996 ft., Bottom: 12300 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4676 ft. | | N | N | SHANNON | 5488 ft. | | N | N | TEEPEE BUTTES | 6662 ft. | | N | N | SHARON SPRINGS | 7437 ft. | | N | N | NIOBRARA | 7487 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2022 Interval Top: 7879 ft. Interval Bottom: 12257 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/10/2018 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/3/2018 | Treatment End Date: | 9/15/2018 | Treatment Summary: | 167234 bbls of water, 155 bbls of additives (FRP-4CS, PLEXSLICK 986C, ACI-97, ASF-67) and 17 bbl HCL in a 27 stage frac with 3952180 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 167406 | Max pressure during treatment (psi): | 8719 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 27 | Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | 0.92 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 9409 | Fresh water used in treatment (bbls): | 167389 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3952180 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 410 | BBLS_OIL | 341 | BTU_GAS | 1284 | CALC_BBLS_H2O | 410 | CALC_BBLS_OIL | 341 | CALC_GOR | 1088 | CALC_MCF_GAS | 371 | CASING_PRESS | 1520 | GRAVITY_OIL | 43 | MCF_GAS | 371 | TUBING_PRESS | 800 |
| Perforation Data: | Interval Top: | 7879 ft. | # Of Holes: | 632 | Interval Bottom: | 12257 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 4328 |
Total Gas Produced (MCF) | 46767 |
GOR | 10805 |
GOR Determination | BOE |
Average BOE per Day | 33.851 |
Average MCFE per Day | 196.308 |
Federal Financial Assurance | i | |
|
|