|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/20/2018 Measured TD: 14650 ft. Vertical TD: 7264 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/20/2018 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/14/2020 | Proposed Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 2164 FNL 1243 FEL | Bottom Hole Location: | Sec:4 Twp: 2N 66W | Footage: 464 FNL 1303 FEL | Proposed Depth/Form: | 14730 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED | Cement: | Sacks: 78, Top: 0 ft., Bottom: 98 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2125 ft., Weight: 40 , Citings Type: PLANNED | Cement: | Sacks: 825, Top: 0 ft., Bottom: 2125 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14730 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2040, Top: , Bottom: 14730 ft. |
| | |
Wellbore Completed | Completion Date: | 8/18/2018 | Spud Date: | 5/26/2018 | Spud Date Is: | ACTUAL | Measured TD: | 14650 ft. | Measured PB depth: | 14626 ft. | True Vertical TD: | 7264 ft. | True Vertical PB depth: | 7263 ft. | Top PZ Location: | Sec:9 Twp: 2N 66W | Footage: 2164 FNL 1243 FEL | Bottom Hole Location: | Sec:4 Twp: 2N 66W | Footage: 464 N 1303 E | Log Types: | MUD, MWD/LWD, CBL, (DIL in API 123-08926) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL | Cement: | Sacks: 54, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2188 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 827, Top: 0 ft., Bottom: 2188 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14638 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 1863, Top: 1854 ft., Bottom: 14650 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4476 ft. | | N | N | SHANNON | 5106 ft. | | N | N | TEEPEE BUTTES | 6404 ft. | | N | N | SHARON SPRINGS | 7301 ft. | | N | N | NIOBRARA | 7425 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 12/20/2018 Interval Top: 7677 ft. Interval Bottom: 14592 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/18/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/24/2018 | Treatment End Date: | 11/3/2018 | Treatment Summary: | 270763 bbls of water, 293 bbls of additives (FRP-4CS, SAFE-BFH, XLS-3Z, BHL-68, ACI-97, ASF-67, LGA-3J) and 101 bbl HCL in a 42 stage frac with 6280570 lbs of silica quartz proppant
| Total fluid used in treatment (bbls): | 271157 | Max pressure during treatment (psi): | 8916 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 42 | Total acid used in treatment (bbls): | 101 | Min frac gradient (psi/ft): | 0.94 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 12126 | Fresh water used in treatment (bbls): | 271056 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 6280570 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7366 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/20/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 318 | BBLS_OIL | 365 | BTU_GAS | 1319 | CALC_BBLS_H2O | 318 | CALC_BBLS_OIL | 365 | CALC_GOR | 2397 | CALC_MCF_GAS | 875 | CASING_PRESS | 2000 | GRAVITY_OIL | 49 | MCF_GAS | 875 | TUBING_PRESS | 1200 |
| Perforation Data: | Interval Top: | 7677 ft. | # Of Holes: | 992 | Interval Bottom: | 14592 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 3260 |
Total Gas Produced (MCF) | 107193 |
GOR | 32881 |
GOR Determination | MCFE |
Average BOE per Day | 59.392 |
Average MCFE per Day | 344.474 |
Federal Financial Assurance | i | |
|
|