Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46505
Well Classification: OW Status: PR - 12/1/2018
Well Name/No:Davis #1R-9H-G266
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2018
FacilityID:454356LocationID:428454
County:WELD #123Location:SWNE 9 2N66W 6
Field:WATTENBERG - #90750Elevation:4917 ft.
Planned Location:2030FNL  1463 FELLat/Long: 40.154249 / -104.778035Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.154249 / -104.778034Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/28/2018
End Date: 11/8/2018
Reported: 6/13/2019
Originally Reported: 3/20/2019
Days to report: 217
Days to report: 132
Disclosure: Sidetrack #00
Start Date: 10/28/2018
End Date: 11/8/2018
Reported: 3/20/2019
Days to report: 132
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2018             Measured TD: 15011 ft.    Vertical TD: 7409 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2018
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/14/2020
Proposed Top PZ Location:Sec:9 Twp: 2N 66W Footage: 2171 FNL  2054 FWL
Bottom Hole Location:Sec:4 Twp: 2N 66W Footage: 462 FNL  2080 FWL
Proposed Depth/Form:15055 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2140 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 2140 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15055 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2089, Top: , Bottom: 15055 ft.

Wellbore Completed
Completion Date:6/23/2018
Spud Date:5/13/2018Spud Date Is:ACTUAL
Measured TD:15011 ft.Measured PB depth:14983 ft.
True Vertical TD:7409 ft.True Vertical PB depth:7409 ft.
Top PZ Location:Sec:9 Twp: 2N 66WFootage: 2171 FNL  2054 FWL
Bottom Hole Location:Sec:4 Twp: 2N 66WFootage: 462 N  2080 W
Log Types:Mud Log, MWD/LWD, CBL (DIL in API 123-08926)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 54, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2186 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 851, Top: 0 ft., Bottom: 2186 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14996 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1905, Top: 364 ft., Bottom: 15011 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4585 ft.NN
SHANNON5232 ft.NN
TEEPEE BUTTES6567 ft.NN
SHARON SPRINGS7369 ft.NN
NIOBRARA7468 ft.NN
FORT HAYS7909 ft.NN
CODELL7988 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/23/2019                 Interval Top: 12006 ft.    Interval Bottom: 12122 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12006 ft.# Of Holes:571
Interval Bottom:12122 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/23/2019                 Interval Top: 11826 ft.    Interval Bottom: 12005 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:11826 ft.# Of Holes:571
Interval Bottom:12005 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/23/2019                 Interval Top: 8044 ft.    Interval Bottom: 14951 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2019Treatment End Date:N/A
Treatment Summary:8044' - 11825', 12137' - 14951'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8044 ft.# Of Holes:571
Interval Bottom:14951 ft.Hole Size:

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 12/20/2018                Interval Top: 8044 ft.    Interval Bottom: 14951 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:1/18/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/28/2018Treatment End Date:11/8/2018
Treatment Summary:170793 bbls of water, 224 bbls of additives (FRP-4CS, SAFE-BFH, XLS-3Z, BHL-68, ACI-97, ASF-67, LGA-3J) and 54 bbl HCL in a 25 stage frac with 4138430 lbs of silica quartz proppant
Total fluid used in treatment (bbls):171071Max pressure during treatment (psi):9045
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):54Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9651
Fresh water used in treatment (bbls):171017Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4138430Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7743 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/20/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 286
BBLS_OIL 428
BTU_GAS 1352
CALC_BBLS_H2O 286
CALC_BBLS_OIL 428
CALC_GOR 1713
CALC_MCF_GAS 733
CASING_PRESS 2350
GRAVITY_OIL 49
MCF_GAS 733
TUBING_PRESS 1250
Perforation Data:
Interval Top:8044 ft.# Of Holes:571
Interval Bottom:14951 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)4030
Total Gas Produced (MCF)102233
GOR25367
GOR DeterminationMCFE
Average BOE per Day59.121
Average MCFE per Day342.902

 Federal Financial Assurance  i 

 Tribal Well  i No