|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/1/2023 Measured TD: 16674 ft. Vertical TD: 6553 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/1/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 3/5/2020 | Prop Depth/Form: | 16762 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-973 , Unit Acreage: 1280, Drill Unit: 6:ALL, 5:ALL | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 100 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 650, Top: 0 ft., Bottom: 1850 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16762 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 1860, Top: 4000 ft., Bottom: 16762 ft. |
| | |
Wellbore Completed | Completion Date: | 4/3/2018 | Spud Date: | 3/26/2018 | Spud Date Is: | ACTUAL | Measured TD: | 16674 ft. | Measured PB depth: | 16660 ft. | True Vertical TD: | 6553 ft. | True Vertical PB depth: | 6553 ft. | Top PZ Location: | Sec:6 Twp: 8N 60W | Footage: 632 FSL 622 FWL | Depth | Bottom Hole Location: | Sec:5 Twp: 8N 60W | Footage: 715 FSL 309 FEL | Depth | Log Types: | MWD/GR, CBL, Mud Log, DIL | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | Cement: | Sacks: 270, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1925 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 582, Top: 0 ft., Bottom: 1925 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16663 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2270, Top: 769 ft., Bottom: 16663 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PIERRE | 570 ft. | 6392 ft. | N | | PARKMAN | 3554 ft. | 3690 ft. | N | | SUSSEX | 3930 ft. | 4002 ft. | N | | SHANNON | 4846 ft. | 4914 ft. | N | | SHARON SPRINGS | 6392 ft. | 6484 ft. | N | | NIOBRARA | 6484 ft. | 6983 ft. | N | | FORT HAYS | 6806 ft. | 6983 ft. | N | |
Formation CODL Formation Classification: OW Status: PR - 1/1/2023 Interval Top: 6981 ft. Interval Bottom: 16616 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/23/2018 | Choke Size: | 30.000 in. | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/13/2018 | Treatment End Date: | 6/18/2018 | Treatment Summary: | 64 stage perf & pluf completion- 16616'-6981': 444324 total bbls fluid: 441788 bbls fresh water (slurry), 2417 bbls recycled water, & 119 bbls HCl
20970915 lbs total proppant (40/70 sand) | Total fluid used in treatment (bbls): | 444324 | Max pressure during treatment (psi): | 8067 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 64 | Total acid used in treatment (bbls): | 119 | Min frac gradient (psi/ft): | 0.71 | Recycled water used in treatment (bbls): | 2417 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 441788 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 20970915 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6590 ft. | Tubing Packer Depth: | 6581 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/23/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 1695 | BBLS_OIL | 24 | BTU_GAS | 1473 | CALC_BBLS_H2O | 1695 | CALC_BBLS_OIL | 24 | CALC_GOR | 4000 | CALC_MCF_GAS | 96 | GRAVITY_OIL | 35 | MCF_GAS | 96 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 6981 ft. | # Of Holes: | 1512 | Interval Bottom: | 16616 ft. | Hole Size: | 0.34 in. |
|
Formation N-COM Formation Classification: OW Status: PR - 1/1/2023 Completed Information for Formation NOT COMPLETED | 1st Production Date: | 10/1/2022 | Choke Size: | | Formation Name: | NOT COMPLETED | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation N-COM. |
| No Perforation Data was found for formation N-COM. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 27500 |
Total Gas Produced (MCF) | 64756 |
GOR | 2354 |
GOR Determination | BOE |
Average BOE per Day | 105.742 |
Average MCFE per Day | 613.335 |
Federal Financial Assurance | i | |
|
|