Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46459
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:Hunt 8-60 #6C-5-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CIVITAS NORTH LLC - 10661
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:454219LocationID:454166
County:WELD #123Location:LOT 7 6 8N60W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4961 ft.
Planned Location:1185FSL  660 FWLLat/Long: 40.687236 / -104.141128Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.687237 / -104.141128Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/13/2018
End Date: 6/18/2018
Reported: 8/20/2018
Days to report: 63
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 16674 ft.    Vertical TD: 6553 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/5/2020
Prop Depth/Form:16762 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 535-973 , Unit Acreage: 1280, Drill Unit: 6:ALL, 5:ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 43 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16762 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1860, Top: 4000 ft., Bottom: 16762 ft.

Wellbore Completed
Completion Date:4/3/2018
Spud Date:3/26/2018Spud Date Is:ACTUAL
Measured TD:16674 ft.Measured PB depth:16660 ft.
True Vertical TD:6553 ft.True Vertical PB depth:6553 ft.
Top PZ Location:Sec:6 Twp: 8N 60WFootage: 632 FSL  622 FWLDepth
Bottom Hole Location:Sec:5 Twp: 8N 60WFootage: 715 FSL  309 FELDepth
Log Types:MWD/GR, CBL, Mud Log, DIL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1925 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 582, Top: 0 ft., Bottom: 1925 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16663 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2270, Top: 769 ft., Bottom: 16663 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE570 ft.6392 ft.N
PARKMAN3554 ft.3690 ft.N
SUSSEX3930 ft.4002 ft.N
SHANNON4846 ft.4914 ft.N
SHARON SPRINGS6392 ft.6484 ft.N
NIOBRARA6484 ft.6983 ft.N
FORT HAYS6806 ft.6983 ft.N

Formation CODL                     Formation Classification:  OW                     Status:  PR - 1/1/2023                  Interval Top: 6981 ft.    Interval Bottom: 16616 ft.

 Completed Information for Formation CODELL
1st Production Date:7/23/2018Choke Size:30.000 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/13/2018Treatment End Date:6/18/2018
Treatment Summary:64 stage perf & pluf completion- 16616'-6981': 444324 total bbls fluid: 441788 bbls fresh water (slurry), 2417 bbls recycled water, & 119 bbls HCl 20970915 lbs total proppant (40/70 sand)
Total fluid used in treatment (bbls):444324Max pressure during treatment (psi):8067
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:64
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):2417Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):441788Disposition method For flowback:DISPOSAL
Total proppant used (lbs):20970915Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6590 ft.
Tubing Packer Depth:6581 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/23/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1695
BBLS_OIL 24
BTU_GAS 1473
CALC_BBLS_H2O 1695
CALC_BBLS_OIL 24
CALC_GOR 4000
CALC_MCF_GAS 96
GRAVITY_OIL 35
MCF_GAS 96
TUBING_PRESS 200
Perforation Data:
Interval Top:6981 ft.# Of Holes:1512
Interval Bottom:16616 ft.Hole Size:0.34 in.

Formation N-COM                   Formation Classification:  OW                   Status:  PR - 1/1/2023

 Completed Information for Formation NOT COMPLETED
1st Production Date:10/1/2022Choke Size: 
Formation Name:NOT COMPLETEDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation N-COM.
No Perforation Data was found for formation N-COM.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)27500
Total Gas Produced (MCF)64756
GOR2354
GOR DeterminationBOE
Average BOE per Day105.742
Average MCFE per Day613.335

 Federal Financial Assurance  i 

 Tribal Well  i No