Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46445
Well Classification: OW Status: PR - 7/5/2019
Well Name/No:GRACIE #24-14HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/5/2019
FacilityID:454183LocationID:432526
County:WELD #123Location:SWSE 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5052 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:385FSL  1804 FELLat/Long: 40.117615 / -104.722300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117615 / -104.722300Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/26/2019
End Date: 4/28/2019
Reported: 6/26/2019
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/5/2019             Measured TD: 12661 ft.    Vertical TD: 7491 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/5/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/1/2020
Proposed Top PZ Location:Sec:25 Twp: 2N 66W Footage: 50 FNL  1957 FEL
Bottom Hole Location:Sec:25 Twp: 2N 66W Footage: 471 FSL  1940 FEL
Proposed Depth/Form:12622 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 200, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12612 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1476, Top: , Bottom: 12612 ft.

Wellbore Completed
Completion Date:7/20/2018
Spud Date:5/12/2018Spud Date Is:ACTUAL
Measured TD:12661 ft.Measured PB depth:12639 ft.
True Vertical TD:7491 ft.True Vertical PB depth:7490 ft.
Top PZ Location:Sec:24 Twp: 2N 66WFootage: 6 FNL  1966 FEL
Bottom Hole Location:Sec:25 Twp: 2N 66WFootage: 471 FSL  1495 FEL
Log Types:CBL, MWD/LWD. (GR/RES in API 123-46443).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1847 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 518, Top: 0 ft., Bottom: 1847 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12652 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1060, Top: 1404 ft., Bottom: 12661 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1498 ft.
PARKMAN4224 ft.
SUSSEX4712 ft.
SHARON SPRINGS7199 ft.
NIOBRARA7276 ft.
FORT HAYS7757 ft.
CODELL8145 ft.
CARLILE9284 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/7/2019                  Interval Top: 9284 ft.    Interval Bottom: 11558 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/7/2019Treatment End Date:N/A
Treatment Summary:9284-9359, 11402-11558
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9284 ft.# Of Holes:252
Interval Bottom:11558 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/7/2019                  Interval Top: 8145 ft.    Interval Bottom: 12620 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/7/2019Treatment End Date:N/A
Treatment Summary:8145-9284, 9359-11402, 11558-12620
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8145 ft.# Of Holes:252
Interval Bottom:12620 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 7/5/2019                  Interval Top: 7838 ft.    Interval Bottom: 12620 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:5/22/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/26/2019Treatment End Date:4/28/2019
Treatment Summary:PERF AND FRAC FROM 7838-12620. 24 BBL 15% HCL ACID, 38 BBL 7.5% HCL ACID, 1,947 BBL PUMP DOWN, 70,451 BBL SLICKWATER, 72,460 TOTAL FLUID, 2,182,050# 40/70 OTTAWA/ST. PETERS, 2,182,050# TOTAL SAND.
Total fluid used in treatment (bbls):72460Max pressure during treatment (psi):7578
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):62Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5426
Fresh water used in treatment (bbls):72398Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2182050Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7494 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/5/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 317
BTU_GAS 1266
CALC_BBLS_H2O 80
CALC_BBLS_OIL 317
CALC_GOR 845
CALC_MCF_GAS 268
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 268
TUBING_PRESS 1500
Perforation Data:
Interval Top:7838 ft.# Of Holes:252
Interval Bottom:12620 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/7/2019                  Interval Top: 7838 ft.    Interval Bottom: 8145 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/7/2019Treatment End Date:N/A
Treatment Summary:7838-8145
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7838 ft.# Of Holes:252
Interval Bottom:8145 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3656
Total Gas Produced (MCF)88517
GOR24211
GOR DeterminationMCFE
Average BOE per Day51.722
Average MCFE per Day300.032

 Federal Financial Assurance  i 

 Tribal Well  i No