Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46441
Well Classification: OW Status: PR - 7/3/2019
Well Name/No:GRACIE #24-12HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/3/2019
FacilityID:454178LocationID:432526
County:WELD #123Location:SWSE 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5052 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:385FSL  1834 FELLat/Long: 40.117616 / -104.722407Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117615 / -104.722408Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/26/2019
End Date: 5/3/2019
Reported: 6/26/2019
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/3/2019             Measured TD: 12542 ft.    Vertical TD: 7349 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/3/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/1/2020
Proposed Top PZ Location:Sec:25 Twp: 2N 66W Footage: 50 FNL  2322 FEL
Bottom Hole Location:Sec:25 Twp: 2N 66W Footage: 470 FSL  2355 FEL
Proposed Depth/Form:12519 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12509 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1464, Top: , Bottom: 12509 ft.

Wellbore Completed
Completion Date:7/15/2018
Spud Date:5/11/2018Spud Date Is:ACTUAL
Measured TD:12542 ft.Measured PB depth:12518 ft.
True Vertical TD:7349 ft.True Vertical PB depth:7349 ft.
Top PZ Location:Sec:25 Twp: 2N 66WFootage: 147 FNL  2326 FEL
Bottom Hole Location:Sec:25 Twp: 2N 66WFootage: 470 FSL  2340 FEL
Log Types:CBL, MWD/LWD. (GR/RES in API 123-46443).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1855 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 696, Top: 0 ft., Bottom: 1855 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12532 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1033, Top: 1442 ft., Bottom: 12542 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1503 ft.
PARKMAN4264 ft.
SUSSEX4752 ft.
SHARON SPRINGS7329 ft.
NIOBRARA7454 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/3/2019                  Interval Top: 7860 ft.    Interval Bottom: 12500 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/22/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/26/2019Treatment End Date:5/3/2019
Treatment Summary:PERF AND FRAC FROM 7860-12500. 438 BBL 7.5% HCL ACID, 3,485 BBL PUMP DOWN, 124,538 BBL SLICKWATER, 128,461 TOTAL FLUID, 3,738,252# 40/70 OTTAWA/ST. PETERS, 3,738,252# TOTAL SAND.
Total fluid used in treatment (bbls):128461Max pressure during treatment (psi):7718
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):438Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7896
Fresh water used in treatment (bbls):128023Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3738252Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7289 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/3/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 52
BBLS_OIL 151
BTU_GAS 1266
CALC_BBLS_H2O 52
CALC_BBLS_OIL 151
CALC_GOR 2603
CALC_MCF_GAS 393
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 393
TUBING_PRESS 1500
Perforation Data:
Interval Top:7860 ft.# Of Holes:552
Interval Bottom:12500 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2570
Total Gas Produced (MCF)84145
GOR32741
GOR DeterminationMCFE
Average BOE per Day46.766
Average MCFE per Day271.237

 Federal Financial Assurance  i 

 Tribal Well  i No