Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46438
Well Classification: OW Status: PR - 7/8/2019
Well Name/No:GRACIE #24-5HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/8/2019
FacilityID:454175LocationID:432526
County:WELD #123Location:SESW 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5082 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:345FSL  1655 FWLLat/Long: 40.117475 / -104.729055Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117475 / -104.729055Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/13/2019
End Date: 5/19/2019
Reported: 7/18/2019
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/8/2019             Measured TD: 12587 ft.    Vertical TD: 7319 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/8/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/1/2020
Proposed Top PZ Location:Sec:25 Twp: 2N 66W Footage: 50 FNL  1142 FWL
Bottom Hole Location:Sec:25 Twp: 2N 66W Footage: 470 FSL  1156 FWL
Proposed Depth/Form:12489 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 40 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12479 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1460, Top: , Bottom: 12479 ft.

Wellbore Completed
Completion Date:8/11/2018
Spud Date:5/27/2018Spud Date Is:ACTUAL
Measured TD:12587 ft.Measured PB depth:12564 ft.
True Vertical TD:7319 ft.True Vertical PB depth:7319 ft.
Top PZ Location:Sec:24 Twp: 2N 66WFootage: 36 FSL  1154 FWL
Bottom Hole Location:Sec:25 Twp: 2N 66WFootage: 473 FSL  1139 FWL
Log Types:CBL, MWD/LWD. (GR/RES in API 123-46432).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1883 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 1883 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12577 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1120, Top: 1634 ft., Bottom: 12587 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1523 ft.
PARKMAN4295 ft.
SUSSEX4783 ft.
SHARON SPRINGS7380 ft.
NIOBRARA7508 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/8/2019                  Interval Top: 7744 ft.    Interval Bottom: 12545 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/5/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/13/2019Treatment End Date:5/19/2019
Treatment Summary:PERF AND FRAC FROM 7744-12545. 143 BBL 15% HCL ACID, 343 BBL 7.5% HCL ACID, 3,817 BBL PUMP DOWN, 119,836 BBL SLICKWATER, 124,139 TOTAL FLUID, 3,733,375# 40/70 OTTAWA/ST. PETERS, 3,733,375# TOTAL SAND.
Total fluid used in treatment (bbls):124139Max pressure during treatment (psi):7846
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):486Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):1365Total flowback volume recovered (bbls):5395
Fresh water used in treatment (bbls):122288Disposition method For flowback:RECYCLE
Total proppant used (lbs):3733375Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7372 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 44
BTU_GAS 1266
CALC_BBLS_H2O 22
CALC_BBLS_OIL 44
CALC_GOR 1432
CALC_MCF_GAS 63
CASING_PRESS 1675
GRAVITY_OIL 47
MCF_GAS 63
TUBING_PRESS 1500
Perforation Data:
Interval Top:7744 ft.# Of Holes:588
Interval Bottom:12545 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1854
Total Gas Produced (MCF)41332
GOR22293
GOR DeterminationMCFE
Average BOE per Day24.636
Average MCFE per Day142.907

 Federal Financial Assurance  i 

 Tribal Well  i No