Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46401
Well Classification: OW Status: PR - 6/3/2019
Well Name/No:GRACIE #24-23HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/3/2019
FacilityID:454086LocationID:305784
County:WELD #123Location:SESE 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5030 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:307FSL  307 FELLat/Long: 40.117426 / -104.716946Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117425 / -104.716947Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/8/2019
End Date: 4/19/2019
Reported: 6/19/2019
Days to report: 61
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/3/2019             Measured TD: 15978 ft.    Vertical TD: 7287 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/3/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/14/2020
Proposed Top PZ Location:Sec:30 Twp: 2N 65W Footage: 50 FNL  582 FWL
Bottom Hole Location:Sec:31 Twp: 2N 65W Footage: 2406 FSL  674 FWL
Proposed Depth/Form:15968 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15958 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1885, Top: , Bottom: 15958 ft.

Wellbore Completed
Completion Date:8/26/2018
Spud Date:5/30/2018Spud Date Is:ACTUAL
Measured TD:15978 ft.Measured PB depth:15942 ft.
True Vertical TD:7287 ft.True Vertical PB depth:7287 ft.
Top PZ Location:Sec:19 Twp: 2N 66WFootage: 82 FSL  584 FWL
Bottom Hole Location:Sec:31 Twp: 2N 65WFootage: 2410 FSL  654 FWL
Log Types:CBL, MWD/LWD. (GR/CNL in API 123-46397).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1838 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 717, Top: 0 ft., Bottom: 1838 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15967 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1490, Top: 1578 ft., Bottom: 15978 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1479 ft.
PARKMAN4308 ft.
SUSSEX4796 ft.
SHARON SPRINGS7264 ft.
NIOBRARA7341 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 6/3/2019                  Interval Top: 7669 ft.    Interval Bottom: 15924 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/9/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/8/2019Treatment End Date:4/19/2019
Treatment Summary:PERF AND FRAC FROM 7669-15924. 676 BBL 15% HCL ACID, 133 BBL 7.5% HCL ACID, 9,975 BBL PUMP DOWN, 204,728 BBL SLICKWATER, 215,512 TOTAL FLUID, 6,628,473# 40/70 OTTAWA/ST. PETERS, 6,628,473# TOTAL SAND.
Total fluid used in treatment (bbls):215512Max pressure during treatment (psi):7807
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:41
Total acid used in treatment (bbls):809Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):5800
Fresh water used in treatment (bbls):214703Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6628473Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7468 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BBLS_OIL 173
BTU_GAS 1266
CALC_BBLS_H2O 100
CALC_BBLS_OIL 173
CALC_GOR 1584
CALC_MCF_GAS 274
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 274
TUBING_PRESS 1500
Perforation Data:
Interval Top:7669 ft.# Of Holes:1152
Interval Bottom:15924 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4223
Total Gas Produced (MCF)113570
GOR26893
GOR DeterminationMCFE
Average BOE per Day66.289
Average MCFE per Day384.468

 Federal Financial Assurance  i 

 Tribal Well  i No