Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46395
Well Classification: OW Status: PR - 6/6/2019
Well Name/No:GRACIE #24-18HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/6/2019
FacilityID:454071LocationID:305784
County:WELD #123Location:SESE 24 2N66W 6
Field:WATTENBERG - #90750Elevation:5030 ft.
Planned Location:382FSL  306 FELLat/Long: 40.117632 / -104.716944Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.117632 / -104.716944Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/19/2019
End Date: 4/21/2019
Reported: 6/19/2019
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/6/2019             Measured TD: 12750 ft.    Vertical TD: 7471 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/6/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/14/2020
Proposed Top PZ Location:Sec:25 Twp: 2N 66W Footage: 44 FNL  1079 FEL
Bottom Hole Location:Sec:25 Twp: 2N 66W Footage: 475 FSL  967 FEL
Proposed Depth/Form:12698 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12688 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1486, Top: , Bottom: 12688 ft.

Wellbore Completed
Completion Date:9/13/2018
Spud Date:6/3/2018Spud Date Is:ACTUAL
Measured TD:12750 ft.Measured PB depth:12726 ft.
True Vertical TD:7471 ft.True Vertical PB depth:7471 ft.
Top PZ Location:Sec:25 Twp: 2N 66WFootage: 44 FNL  1079 FEL
Bottom Hole Location:Sec:25 Twp: 2N 66WFootage: 475 FSL  967 FEL
Log Types:CBL, MWD/LWD. (GR/CNL in API 123-46397).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1882 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 0 ft., Bottom: 1882 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12741 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1150, Top: 2224 ft., Bottom: 12750 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1477 ft.
PARKMAN4286 ft.
SUSSEX4774 ft.
SHARON SPRINGS7261 ft.
NIOBRARA7344 ft.
FORT HAYS7862 ft.
CODELL8127 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/25/2019                 Interval Top: 8128 ft.    Interval Bottom: 12707 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/25/2019Treatment End Date:N/A
Treatment Summary:8128-12707
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8128 ft.# Of Holes:240
Interval Bottom:12707 ft.Hole Size:0.44 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 6/6/2019                  Interval Top: 7951 ft.    Interval Bottom: 12707 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:5/9/2019Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/19/2019Treatment End Date:4/21/2019
Treatment Summary:PERF AND FRAC FROM 7951-12707. 97 BBL 7.5% HCL ACID, 1,680 BBL PUMP DOWN, 957 BBL WATER, 67,404 BBL SLICKWATER, 70,138 TOTAL FLUID, 2,082,080# 40/70 OTTAWA/ST. PETERS, 2,082,080# TOTAL SAND.
Total fluid used in treatment (bbls):70138Max pressure during treatment (psi):7409
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):97Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):3758
Fresh water used in treatment (bbls):70041Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2082080Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7549 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/6/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 292
BTU_GAS 1266
CALC_BBLS_H2O 25
CALC_BBLS_OIL 292
CALC_GOR 1418
CALC_MCF_GAS 414
CASING_PRESS 2500
GRAVITY_OIL 47
MCF_GAS 414
TUBING_PRESS 1500
Perforation Data:
Interval Top:7951 ft.# Of Holes:240
Interval Bottom:12707 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 6/25/2019                 Interval Top: 7951 ft.    Interval Bottom: 8128 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/25/2019Treatment End Date:N/A
Treatment Summary:7951-8128
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7951 ft.# Of Holes:240
Interval Bottom:8128 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2024 - May 2025i
Total Oil Produced (Barrels)3742
Total Gas Produced (MCF)114121
GOR30497
GOR DeterminationMCFE
Average BOE per Day63.835
Average MCFE per Day370.227

 Federal Financial Assurance  i 

 Tribal Well  i No